DTI Dyna Technology Winco PSS40LS Installation And Operation Manual

Engine generator set

Advertisement

Quick Links

PSS27LS/D
PSS40LS/C
PSS40LS Engine Generator Set
PACKAGE
STANDBY
SYSTEMS
INSTALLATION AND
OPERATIONS MANUAL

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Winco PSS40LS and is the answer not in the manual?

Questions and answers

Summary of Contents for DTI Dyna Technology Winco PSS40LS

  • Page 1 PACKAGE STANDBY SYSTEMS PSS27LS/D INSTALLATION AND OPERATIONS MANUAL PSS40LS/C PSS40LS Engine Generator Set...
  • Page 2: Table Of Contents

    SAVE THESE INSTRUCTIONS TABLE OF CONTENTS This manual contains important instructions that should be followed during installation and maintenance INTRODUCTION of the generator and batteries. GUIDE TO PRODUCT SAFETY BASIC INFORMATION Read and understand all instructions in the manual Description before starting and operating the generator set.
  • Page 3: Guide To Product Safety

    IMPORTANT SAFETY FIRE HAZARD - Natural gas and L.P. present a hazard of possible explosion and/or fire. INSTRUCTIONS Do not smoke or use open flame near the generator set. Keep a fire extinguisher nearby and know its proper use. SAVE THESE INSTRUCTION Fire extinguishers rated ABC by NFPA are appropriate.
  • Page 4: Basic Information

    2) ENGINE/GENERATOR TESTING POLICY: PSS27LS- The engine generator set consists of a GM 3.0L, I-4 Industrial, four cylinder, liquid cooled engine equipped to run on Before any generator is shipped from the factory, it is fully L.P./N.G. fuel. The engine operates at 1800 rpm and frequency checked for performance.
  • Page 5: Dgc-2020 Engine Control Layout

    Generator Protection and Metering All metering functions are displayed on the liquid crystal display. The front panel display begins with the SUMMARY SCREEN. Generator protection guards against over voltage, under voltage, Pressing the Right arrow key will open the MAIN MENU screen. under frequency, and over frequency.
  • Page 6: Specification Table

    J - Reset Push-button. This button is pressed to cancel a Repeat sequence 5 through 8 for day, minute, second and settings editing session and discard any settings changes. When DST (Daylight Saving Time. pressed, this button also resets the Breaker Management Pre- To finish clock setting, process - Press ‘K’...
  • Page 7: Preparing The Unit

    General Information The engine manufacturer has established an excellent world-wide engine service organization; engine service is available from a nearby authorized dealer or distributor; check the Yellow Pages These engine generator sets are for outdoor installation. These of the telephone directory under “engines,” or ask the dealer from units must be bolted solidly to a concrete pad.
  • Page 8: Fuel Line Installation

    Connect the fuel supply to the inlet of the fuel solenoid (see table FUEL PRESSURE (vapor system) for recommended line size). The pressure at the secondary demand regulator must be four to six ounces psi (per square Correct fuel pressure cannot be stressed enough. The most inch) or 7 to 11 inches W.C.
  • Page 9: Lp Liquid Withdrawal

    Notice the preceding tables give two (2) different units of measur- When installing or replacing batteries, use the proper group/size ing fuel pressure. The first is with a pressure gauge calibrated in starting battery. The battery should be a Maintenance Free lead ounces per square inch.
  • Page 10: Battery Charger/Block Heater Wiring

    properly installed, the normal A.T.S. Control and safety systems Never fill the battery above the fill line. Over filling above the will eliminate all paths for feedback. upper level line may cause the electrolyte to overflow, resulting in corrosion to the engine or nearby parts. Immediately wash off To wire the automatic transfer switch into the existing wiring, first any spilled electrolyte following the procedure above.
  • Page 11: Dc Electrical Connections

    B - Generator Circuit Breaker, This circuit breaker provides By code, the wire must be heavy enough to handle the full current overload protection for the generator. Your power feeds from the rating of the main line circuit-breaker (or fuse) in the entrance (or transfer switch will connect to the bottom lugs on the circuit sub-panel) protecting the contactor switch.
  • Page 12 CONTROL PANEL LAYOUT generator control terminal box. Depending on the distance, 14 to 16 gauge stranded wire should be used. These wires should be A - DGC-2020 Digital Gen-Set Control. See Explanation on labeled S1 and S23. page 3. ************* B - DC Control Circuit Fuse.
  • Page 13: Initial Start-Up

    With the engine running smoothly check the no load voltage and frequency on the digital display. The voltage should be 208/240/ 480 AC depending on which model you have and a frequency of 59.5 To 60.5 hertz (Hz). If you have the proper voltage at the generator the next step is to check the voltage at the generator terminals in the Automatic Transfer Switch.
  • Page 14: Lp/Ng Conversion

    Defective "Run/Auto" switch on generator or ATS PANEL WILL NOT RETRANSFER TO NORMAL transfer switch. POWER Defective starter. Defective start solenoid. Proper normal line power not available at line terminals in ATS panel. ENGINE WILL NOT CRANK WITH GENERATOR Defective holding coil in line side contactor. RUN PUSH-BUTTON DEPRESSED.
  • Page 15: Voltage Regulator Wiring

    You are now ready to make the final fuel mixture adjustment. column. If not, adjust the screw down to increase and up to These engines were adjusted at the factory to produce about .7 to decrease and retest. 3.4% CO. If you have the ability to test the CO, adjust the mixture Next the timing on the engine must be changed.
  • Page 16: 277/480 Volt

    7263-00 Page 14 60706-188...
  • Page 17: 120/240 Volt

    7263-00 60706-188 Page 15...
  • Page 18: Dc Schematic - Wiring Diagram

    7263-00 Page 16 60706-188...
  • Page 19: Outline Drawing

    7263-00 60706-188 Page 17...
  • Page 20: Month Warranty

    12 MONTH LIMITED WARRANTY WINCO, Incorporated warrants to the original purchaser for 12 months or 1000 hours which ever occurs first, that goods manufactured or supplied by it will be free from defects in workman- ship and material, provided such goods are installed, operated and maintained in accordance with WINCO written instructions.

This manual is also suitable for:

Winco pss27ls/dWinco pss40ls/c

Table of Contents