Viessmann V AH-300 Installation And Service Instructions For Contractors page 6

Condensate lifting system
Table of Contents

Advertisement

Positioning and connecting
(cont.)
Note
The level switch and overflow alarm
switch must be fully inserted into the
locking ring fitting, so that they rest
against the locking ring fitting.
6

Advertisement

Table of Contents
loading

This manual is also suitable for:

7441 770

Table of Contents