Positioning and connecting
A
A Neutralising system
1. Remove the cover from the con-
tainer and take out the small parts
supplied.
2. Fit supply hose connection (either
DN 20 or DN 25) with a gasket and
nuts.
3. Install the condensate lifting system
in the required location.
4. Route the supply hose to the con-
densate lifting system with a fall.
Secure the hose with hose clips.
Note
Never step on the hose. Protect the
hose against mechanical damage.
B
B Condensate lifting system
5. Route the drain hose into the drain-
age system. Secure the hose with
hose clips.
Note
■ Secure the free end of the drain
hose, because water flows out
under pressure
■ If the drain hose is extended
and/or constricted by hose con-
nectors, this leads to a reduction
in the pump rate/delivery head
6. Close the condensate lifting system
cover.
5