Date: June 1, 2015 Product Line: Bambi Models: Bambi Max Subject: IVC cable installation Background Older Bambi Max manuals instruct operators to fasten the IVC power cable to the IDS hub and deployment cable using zip‐ties. Operators are instructed to provide some slack during installation. Despite this, SEI has observed incidences of the power cable being pulled from the strain relief on the IVC, resulting in water ingress. The zip‐tie may gradually work along the power cable over time and eliminate slack. Recommendations SEI recommends that operators avoid fastening the power cable to the IDS or IDS deployment cable all together. Instead the operators should fasten the cable directly to the bucket head with 4 zip‐ties as illustrated in Figure 1. Operators must ensure that there is at least 6” of slack in the line. It is recommended that operators quickly check that there is adequate slack in the line before flight. New buckets will already have the installation shown in Figure 1. SEI Industries Ltd. 7400 Wilson Avenue, Delta, B.C. Canada V4G 1H3 T: 604.946.3131 seisales@sei-ind.com www.sei-ind.com Page 1 of 2...
Page 2
Figure 1 ‐ Recommended Layout This Technical Bulletin is available on the SEI website. http://www.sei-ind.com/resources/manuals For further details, please contact the following SEI representatives. Contact Robert Button Product Engineer, Firefighting Division 604‐946‐3131 ext. 423 robert@sei‐ind.com SEI Industries Ltd. 7400 Wilson Avenue, Delta, B.C. Canada V4G 1H3 T: 604.946.3131 seisales@sei-ind.com www.sei-ind.com Page 2 of 2...
Need help?
Do you have a question about the Bambi Max and is the answer not in the manual?
Questions and answers