Download Print this page

Idex Knight Trak II KTL-6503 Instruction Manual page 7

Advertisement

(1) Measure the distances from chemical supply container to pump housing and from pump housing to
injection point inside the washmachine.
(2) Insert one end of a suction tube into the left side of the squeeze tube in the leftmost peristaltic pump.
(3) Cut the suction tube to length and insert other end into supply container using PVC pipe as a
support.
(4) Insert one end of the discharge tubing into the right side of the squeeze tube on each peristaltic
pump.
(5) If running pump outputs directly to the washer, form an antisiphon loop (with the loop pointing
"down") with the other end of the discharge tubing and insert the end into the supply pocket of the
machine.
(6) If running a chemical flushing system, refer to the instructions provided with the system. For flush
mode to work correctly, the flush terminals on the POB must be connected together with a jumper, or
to a flow sensor. If this is not done, a flush error will result and the system will be disabled. To reset
the system, push the reset button on the lfp.
(7) Connect the 115 VAC or 230 VAC supply voltage to the system.
(8) Program the system using the LFP. Detailed instructions regarding the programming of the system
are located in the LFP Programming Manual.
(9) For accuracy, when autocalibrating or testing flow rates, always measure chemicals at the washer.
Product viscosity and tubing lengths will have a effect on the flow rates.
(10) Operate the washer and inspect for proper function. If using auto formula select, ensure that correct
formulas are chosen. Otherwise, use the FORMULA (up and down) buttons on the LFP to choose
formulas. You will then be able to verify proper formula operation of the Knight-Trak II system.
0901039 Rev: C (05/01)
Page 7 of 16

Advertisement

loading