Fig. 91: Removing Insulation Sheets; Fig. 92: Removing Cartridge Group 1; Table 58: Threaded Rod, Value X - ABB HT609267 Operation Manual

Table of Contents

Advertisement

Operation Manual / A150-M56/66/57/67 - A155-M..
11 Dismantling and fitting, cartridge concept / 11.3 Removing the cart-
ridge group
11.3
Removing the cartridge group
Fig. 91: Removing insulation sheets
If present: Remove insulation sheets.
u
Fig. 92: Removing cartridge group 1
Product
A150-M
A155-M
Table 58: Threaded rod, value X
1. Apply two marking lines (M) to the left and right of the cartridge group and the bracket.
2. Support and fix the turbine casing.
3. Loosen the clamping nut (42201) (see
4. Screw threaded rod (42191) up to value X at the hexagon.
5. Lift the centering bush (42193) using the threaded rod (42191) and hold it firmly.
If the centering bush jams:
Remove the clamping nut and rotate the threaded rod upwards using a standard nut.
6. Rotate the clamping nut (42201) downwards until the stop is reached.
© Copyright 2021 ABB. All rights reserved.
Value X [mm]
Loosening the clamping nut
HZTL4032_EN
112 ±2 mm
144 ±2 mm
→31).
Rev.R
August 2021

Advertisement

Table of Contents
loading

This manual is also suitable for:

A150dd005a1

Table of Contents