Download Print this page

East Cover SSL202012 Assembly Instructions Manual

Livestocktent 20'x20'x12' w6.0xl6.0xh3.7m

Advertisement

Quick Links

Livestock Tent
SSL202012 20'x20'x12'
W6.0xL6.0xH3.7m
Assembly Instructions
RECOMMENDED TOOLS
Please read instructions COMPLETELY before assembly. This shelter MUST be securely anchored.
THIS IS A TEMPORARY STRUCTURE AND NOT RECOMMENDED AS A PERMANENT STRUCTURE.
Before you start: 4+ individual recommended for assembly, approximate time 5 hr.
Page 1

Advertisement

loading

Summary of Contents for East Cover SSL202012

  • Page 1 Livestock Tent SSL202012 20’x20’x12’ W6.0xL6.0xH3.7m Assembly Instructions RECOMMENDED TOOLS Please read instructions COMPLETELY before assembly. This shelter MUST be securely anchored. THIS IS A TEMPORARY STRUCTURE AND NOT RECOMMENDED AS A PERMANENT STRUCTURE. Before you start: 4+ individual recommended for assembly, approximate time 5 hr.
  • Page 2 ATTENTION: This shelter product is manufactured with quality materials. It is designed to fit our custom fabric cover included. Our shelters offer storage and protection from damage caused by sun, light rain, tree sap, animal - bird excrement and light snow. Please anchor this structure properly.
  • Page 3 Livestock Tent SSL202012 (W6.0xL6.0xH3.7m) Parts List Part Qty/ Description Code Top Bent Joist Roof Bent Joist Sidewall Bent Joist Upright for front and back end (left) Upright for front and back end (right) Upright for middle arch Purlin Lower Portal for back end...
  • Page 4 Stake Peg Roof Cover Back Cover Belt for Winch Tensioning Tube for roof cover 2 sets (3pcs/set) Knitting Rope for roof cover 1 bundle Plastic Plug for No.19 Carriage Bolt M10x80 for purlins Bolt M8x70 for swaged tube Bolt M10x80 for fence Tube Clip Page 4...
  • Page 5: Frame Installation

    Frame Installation Step 1: base plates and stake pegs Page 5...
  • Page 6 Step 2: arch No.1 Step 3: middle arches No.2 & 3 Page 6...
  • Page 7 Step 4: arch No.4 and portals and fences Page 7...
  • Page 8 Step 5: purlins and sidewall fences Page 8...
  • Page 9 Step 6: squaring up the frame and fix base plates by stake peg Page 9...
  • Page 10: Cover Installation

    Cover Installation Step 1: back cover Page 10...
  • Page 11 Step 2: roof cover Now your assembly is completed. Page 11...