Download Print this page

canvascamp BASECAMP Assembly Instructions page 2

Advertisement

19) Hook the inner tent onto the ridge pipe. Start by hooking the inner tent to both
sides of the ridge pipe, then attach it to the de pillars by means of the provided
straps, and, subsequently, attach the 6 remaining hooks to the ridge pipe.
20) Hook the inner tent sidewalls onto the side poles, using the 16 hooks,the 10 D-
rings at the top and the 6 rings at the bottom of the sidewalls. Start from the
middle, and finish at the door side.
21) Attach the toggles on the canvas to the loops at the top of each tent door zipper.
22) Flatten the groundsheet and adjust the general shape of the inner tent.
23) Put the central pole where the groundsheet is reinforced.
24) Drive the 4 remaining pegs into the ground at the bottom of each tent door
zipper, so as to fix the straps at the tent doors to the ground.
25) The outer tent doors can be used as awnings by moving the door poles, the door
guy ropes and the pegs.
26) Check the rope tension regularly and adjust if needed.

Advertisement

loading