Download Print this page

Quoizel BEC9009SBK Assembly Instruction Sheet

Advertisement

Quick Links

6 CORPORATE PARKWAY
,
.
GOOSE CREEK SC 29445
.
.
www quoizel com
Please go to
www.quoizel.com
Tools Required:
Flathead screwdriver, Phillips screwdriver, pliers, wire cutters, wire strippers, electrical tape, safety glasses.
Light Source:
Integrated 14W LED
Estimated Assembly Time:
Preparation:
Identify and inspect all parts before beginning installation. Check package content list and diagrams below to be sure all parts are
present. If any parts are missing or damaged, do not attempt to assemble, install, or operate the fixture. Contact customer service for replacement
parts.
Warnings and Cautions
Turn off electricity at circuit breaker or main fuse box before installation. Consult a licensed electrician if in doubt.
These instructions are provided for your safety. It is very important you read them completely before installing the fixture. We strongly
recommend that a licensed, professional electrician perform the installation.
Package Contents
Mounting
A
Screw
x 3
Fixture
Body
B
x 1
-
STEP 1
Install Glass
A. Unscrew the Mounting Screw,
remove the i
F xture Hood
from
the Fixture Body (B).
B. Insert Glass Panels (D/C) into
slots in the bottom edge of the
Cage. Fold Tabs on the top edge
of the Cage to secure Glass
Panels.
C. Attach the Cage with Glass
Panels back onto fixture hood
and secure by threading the
Mounting Ball onto the Bolts.
Hand tighten until snug.
Figure 1
STEP 2 - Mark the Location for the 3 Mounting Holes
A. Place the light fixture onto the post and mark the location of the 3
mounting holes on the fixture fitter onto the post with the marking
pen.
Fixture
Fitter
Post
Need assistance with parts or assembly? Call Quoizel customer service at 1-800-645-3184
2017 QuoizelInc.
Assembly Instruction Sheet #IS-BEC9009SBK
for product cleaning tips. Go to the
20-30 minutes
Front/Back
C
Glass Panel
x 2
D
F xture
i
Hood
Post
Lighting
Marking Pen
Mounting
Hole
Figure 2
Thank you for purchasing a Quoizel product.
or visit us on-line at www.quoizel.com
For Style BEC9009SBK
Care + Maintenance
selection.
-
STEP 3
M
arking the
A. Remove the light fixture. Using the center punch and hammer
marking the center of each mounting hole location that is marked
with the marking pen.
Side Glass
Panel
x 2
D
C
-
STEP 4
Drill Holes
Mounting
A. Using the 1/16" bit and drill, drill a pilot hole completely through the
Ball
post at each (3) locations marked in step 5 above.
Cage
Figure 4
STEP 5 - Wire Connections
A. Use standard wire connectors (not included) to make all wire
connections. Twist connectors until wires are tightly joined together.
Wrap each connection with approved electrical tape and carefully
stuff all the connected wires into the Outlet Box.
from outlet box
Fixture
Black wire from
Fitter
outlet box (or Red)
Bare, or Green
Ground wire
Post
from outlet box
1of2
C
enter of ach
E
M
ounting
Hammer
Marking
Center Punch
Post
1/16" bit and drill
Post
White wire
Figure 5
_R2
H
ole
Figure 3
White wire
from fixture
Black wire
from fixture
Ground wire
from fixture
RevisedDate:2017-05-08

Advertisement

loading

Summary of Contents for Quoizel BEC9009SBK

  • Page 1 Ground wire from fixture Post from outlet box Figure 2 Figure 5 Thank you for purchasing a Quoizel product. Need assistance with parts or assembly? Call Quoizel customer service at 1-800-645-3184 or visit us on-line at www.quoizel.com RevisedDate:2017-05-08 2017 QuoizelInc. 1of2...
  • Page 2 FINISH: STONE BLACK 18.5” NOTE: ALL DIMENSIONS ARE ROUNDED UP TO THE NEAREST 1/4" Thank you for purchasing a Quoizel product. Need assistance with parts or assembly? Call Quoizel customer service at 1-800-645-3184 or visit us on-line at www.quoizel.com RevisedDate:2017-05-08 2017 QuoizelInc.