Download Print this page

First Start-Up Preparation - Desa BG Series Technical Information, Installation And Operating Instructions

Cabinet warm air heater for oil burner
Hide thumbs Also See for BG Series:

Advertisement

Available languages
  • EN

Available languages

  • ENGLISH, page 130
Before starting and testing warm air heaters, check that:
The protective film has been removed from the
heater walls.
The air guide-vane orientation has been adjusted
according to the position of the heater and to the
needs of the room.
Use adequate safety equipment (gloves etc.).
You must open the air deflectors before installation.
Open the deflectors by taking hold of the ends.
The heater is correctly positioned and the distances
around the heater have been respected (see page
12).
There is fuel available and the supply valves are
open.
The electrical connections to the supply and to the
components (burner, thermostats, etc) have been
made.
The phase - neutral connection must be absolutely
respected.
The earthing connection is obligatory.

FIRST START-UP PREPARATION

21
45°
mimino

Advertisement

loading

This manual is also suitable for:

Bg 50Bg 70Bg 90Bg 110Bg 190Bg 260 ... Show all