Soleus Air WS1-05M2-02 Operating Instructions Manual page 8

5,100 btu window air conditioner
Hide thumbs Also See for WS1-05M2-02:
Table of Contents

Advertisement

INSTALLATION
NOTE: Top Rail and the Side Panels are offset to provide the proper pitch to the rear of (5/16"). This is necessary for
proper condensation utilization and drainage. If you are not using the side panels, the rear pitch must still be maintained.
1.
Attach the top rail onto the top of the outer case using four short screws.
1.
Insert the side curtains into the upper and lower rails of the air conditioner. Fasten the curtains to the unit with short screws
as shown below.
2.
Slide the free end of the curtain into the side panel of the air conditioner. Do this for each side. The flange for securing the
curtain into the window sill will be facing the room side when installed.
3.
Once properly sized, remove the backing to expose the adhesive tape.
.
Top Rail Installation
Top mounting rail
Curtain Installation

Advertisement

Table of Contents
loading

Table of Contents