JJM Boiler Works V Series Installation Operation & Maintenance

JJM Boiler Works V Series Installation Operation & Maintenance

Acidic condensate wastewater and air conditioning non-acidic wastewater removal system
Hide thumbs Also See for V Series:

Advertisement

Quick Links

Revised - June, 2018
VSeries
Acidic Condensate Wastewater and
Air Conditioning Non-Acidic
Wastewater Removal System
Models: V-125
V-250 / V-250 Combi
V-252 / V-253
Installation Operation & Maintenance
14 Coleman Ave. Westfield, MA 01085
690 Island Way Unit 206, Clearwater, FL 33767
jjmboilerworks.com
413-527-1893
413-427-3373

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the V Series and is the answer not in the manual?

Questions and answers

Summary of Contents for JJM Boiler Works V Series

  • Page 1 Revised - June, 2018 VSeries Acidic Condensate Wastewater and Air Conditioning Non-Acidic Wastewater Removal System Models: V-125 V-250 / V-250 Combi V-252 / V-253 Installation Operation & Maintenance 14 Coleman Ave. Westfield, MA 01085 690 Island Way Unit 206, Clearwater, FL 33767 jjmboilerworks.com 413-527-1893 413-427-3373...
  • Page 2 ALL JJM NEUTRALIZING PRODUCTS  WARNING JJM neutralizers are sized by BTU input to establish a flow rating. Job site conditions will determine neutralizer design. See GPH chart below. How much fireside condensate will my equipment develop? Hot water heaters / Boilers / Furnaces / Economizers Equipment Efficiency GPH Condensate .725 / Per 100,000 BTU Input...
  • Page 3: Maintenance

    Indicates a condition or hazard which will cause severe Installer — Instruct the building owner to frequently inspect personal injury, death or major property damage. the V Series cannister cartridge neutrazlier and all condensate connections. The owner must notify a qualified technician if any problems are noticed.
  • Page 4: Application Restrictions

    • Flue pipe condensate drains • DO NOT exhaust flue gases through the V Series canister, Applying V-series neutralizing canisters is not rated for boiler or furnace flue gases. Operating the V Series canister as exhaust vents can cause injury Condensate can be collected from flueways and boiler/furnace/ or death from carbon monoxide.
  • Page 5: Installation

    Acidic Condensate pH Treatment Kits –– Installation/Operation & Maintenance Installation Figure 1 Piping diagram for wall hung heater/V Series vertical pH treatment canister to drain.  LEGEND 1. Flue Pipe 2. Trap BOILER 3. V-250 Inlet 4. V-250 Outlet HOT WATER 5.
  • Page 6 series Acidic Condensate pH Treatment Kits –– Installation/Operation & Maintenance Installation Figure 3 Piping diagram for wall hung heater / V-252 vertical pH treatment canisters.   LEGEND 1. Flue Pipe 2. Trap 3. V-252 Inlet BOILER 4. V-252 Outlet 5.
  • Page 7 series Acidic Condensate pH Treatment Kits –– Installation/Operation & Maintenance Installation V-125 CANISTER Figure 5 Exploded View of V-125 rev. 12/19/17 RATING: 125 MBH RATING: 125 MBH INLET/OUTLET PORT 1/2” NPT 4.5” 9.375” 6.75”...
  • Page 8 4 1 2 " Bracket 4.5" x 2.5" x 3"deep Bracket Screws 4x, 8-18 x 1" Bracket Screws 4x, 8-18 x 1" JJM Boiler Works, Inc. V-250 Part Numbers DETAIL PART PART NUMBER Bracket 4001 10” Outer Canister with gasket 4002 Inner Cartridge with pH Power Pellets®...
  • Page 9 series Acidic Condensate pH Treatment Kits –– Installation/Operation & Maintenance V-250 CANISTER rev. 07/13/2017 Figure 8 V-250 dimensions Figure 9 V-250 pump combi dimensions FRONT VIEW SIDE VIEW 1'-6" 4 1 2 " V250 Pump Combination Unit Dimensions V250 V250 4 3 4 "...
  • Page 10 series Acidic Condensate pH Treatment Kits –– Installation/Operation & Maintenance Installation Figure 10 V-252 dimensions 6.5” 10.75” 10.75” Figure 11 V-253 dimensions 17.375” 6.5” 17.375” 6.5” 17.375”...
  • Page 11 series Acidic Condensate pH Treatment Kits –– Installation/Operation & Maintenance Installation Figure 12 V-125, V-250, V-252 & V-253 / Wall Mounting V-200 Vertical Mount Canister 1/2” x 4” Single Stud Wall Mount 1/2” x 4” Double Stud Wall Mount STUD STUD STUD Mount at least 1 3/4”...
  • Page 12: Maintenance Procedures

    The pellets are Non-Hazardous and can be disposed of in your normal refuge. MSDS sheets can be found online at www.jjmboilerworks.com. Any questions can be directed to JJM Boiler Works, Inc. at 413-527-1893 or at www.jjmboilerworks.com George Carney, President, JJM Boiler Works, Inc.

This manual is also suitable for:

V-125V-250V-250 combiV-252V-253

Table of Contents