Taking The Engine Out Of Operation For Up To 12 Months - ABB HT575675 Operation Manual

Table of Contents

Advertisement

© Copyright 2016 ABB. All rights reserved.
Mothballing the turbocharger
Taking the engine out of operation for
up to 12 months
If the total acid number (TAN) is greater than 2 mg KOH/g, the following
mothballing measures are necessary after taking an engine out of operation:
Dismantle the turbocharger.
τ
The rotor and the bearing parts must be removed by an official ABB
τ
Turbocharging service station and refitted afterwards.
Clean all parts.
τ
Machined, bright surfaces of steel and cast parts must be oiled with
τ
anticorrosive oil.
Reassemble complete turbocharger.
τ
Rotor turning in stack draught
If the rotor turns as a result of the stack draught:
Install blind flange between compressor casing outlet flange and
τ
charge air duct.
Operation Manual / TPS44-F.. - TPS61-F..
10
10.1
Page 120

Advertisement

Table of Contents
loading

This manual is also suitable for:

Tps48-f32

Table of Contents