Preparation Of Chassis; Unit Installation - LG LW6019ER Owner's Manual

Hide thumbs Also See for LW6019ER:
Table of Contents

Advertisement

Preparation of Chassis

1
Insert the top and bottom rails of the
curtain panels into the upper and lower
panel guides.
Fasten the curtain panels to the unit with 8
type A screws.
Fasten screws behind the curtain panel.
Upper Guide
Left Curtain
Panel
Screws
(Type A)
Bottom Guide
NOTE
Use a long screwdriver to make installing
the screws easier.
2
Cut the window sash seals to the proper
length. Peel off the backing and attach the
adhesive-backed foam to the underside of
the window sash and bottom of window
frame.
3
Open the window and draw a center line
on the center of the inner sill.
Then mark lines 8" to the left and right of
the center line.
Center Line
Inner Sill
Room Side
8"
Right
Curtain
Panel
Screws
(Type A)
Foam-PE
(Adhesive backed)
8"
4
Install the L bracket behind the inner
window sill as shown.
Use the 2 type A screws provided.
Inner Sill
Outer Sill
L Bracket
NOTE
The bracket helps to hold unit securely in
place. Be sure to place bracket edge flush
against back of inner sill.

Unit Installation

CAUTION
● During the following step, hold unit firmly until
window sash is lowered to top channel behind
side panel frames. Personal injury or property
damage may result if unit falls from window.
1
Set the air conditioner in the window so that
is centered. Place the air conditioner so that
front edge of the bottom guide is against the
back edge of the sill.
Bring the window down so that the front edge
of the upper guide is in front of the window.
Make sure that air conditioner is level or
tilting slightly to the outside.
Window Frame
Upper Guide
L Bracket
INSTALLATION 11 EN
Screws
(Type A)
Center Line
Seal
¼"
About
Bottom Guide

Advertisement

Table of Contents
loading

Table of Contents