Refer to page 5 for details. 10. CASCADING LINK In the event 2 units of SQ9815 are used in a system, link them with this port. DIP has to be set to identify which unit is either Master or Slave. Refer Details in page 5.
To power down, press the ON/OFF switch and system is shutting down from CH8 to CH1 in steps. Always switch off the mains if the system is not in used. Page 3 SQ9815 | SEQUENTIAL POWER SWITCHER...
Page 4
1 2 3 4 5 6 7 8 disabled in the Slave unit. DIP Switch 8. Select OFF to allow the front ON/OFF switch active whereas ON will disable it. This is applicable in remote switching mode. Page 4 SQ9815 | SEQUENTIAL POWER SWITCHER...
Page 5
Cascading SQ9815 2 units of SQ9815 can be linked to form a 16 channel power distribution setup. Setting has to be made to 1~4 : ADD 1-2-4-8 MASTER UNIT CASC RS485 : CH8 RELAY TRIG LINK make one of them as Master ( Ch 1 to 8 ) and the other...
Lock mode to avoid incidental switching (Press LOCK and ON/OFF to active) • Built in surge protection • Unit is addressable for interfacing with Amperes PMX LAN software for remote monitoring and switching Technical Specifications Operating voltage 230 / 240V AC...
Do not allow the product to rest on or to be installed over power cords of any type. Improper installations of this type create the possibility of fire hazard and / or personal injury. Page 7 SQ9815 | SEQUENTIAL POWER SWITCHER...
Only Amperes Electronics Service Centres are allowed to make warranty repairs : a list of Amperes Electronics Service Centres may be asked for by the purchaser or send directly to Amperes Electronics Sdn Bhd at 70 Jalan Industri PBP 3, Tmn Perindustrian Pusat Bandar Puchong, 47100, Puchong, Selangor, Malaysia or its authorized dealers.
Need help?
Do you have a question about the SQ9815 and is the answer not in the manual?
Questions and answers