INSTALLER'S GUIDE
MOUNTING HOLE LOCATION
After installation has been completed, it is recommended that the entire system be checked against the following list:
1. Refrigerant Line, Leak checked ...................................... [ ]
2. Suction Lines and Fittings properly insulated ................ [ ]
3. Have all Refrigerant Lines been secured
and isolated properly? .................................................... [ ]
4. Have passages through masonry been sealed?
If mortar is used, prevent mortar from coming into
direct contact with copper tubing .................................... [ ]
5. Verify tightness of all electrical connects ....................... [ ]
6. Observe outdoor fan during on cycle for
clearance and smooth operation .................................... [ ]
7. Indoor coil drain line drains freely.
Pour water into drain pan ................................................ [ ]
Technical Literature - Printed in U.S.A.
American Standard Inc.
Troup Highway
Tyler, TX 75707-9010
Note: All Dimensions Are In MM (Inches).
CHECKOUT PROCEDURE
8. Supply registers and return grilles
9. Return air filter installed .................................................. [ ]
10. Thermostat thermometer is accurate.
11. Is correct speed tap being used?
12. Operate complete system in each mode
NOTE:
For model base size,
see table on page 7.
open and unobstructed ................................................... [ ]
Check against a reliable thermometer.
Adjust per instructions with thermostat ........................... [ ]
(Indoor blower motor) ...................................................... [ ]
to insure safe operation. ................................................. [ ]
From Dwg. 21D152989 Rev. 0
Pub. No. 11-AC18D1-2
P.I. 9/05