4.3 Piping Work
4.3.1 Specification of Connection Pipe
Model
VEAH024C432P
VEAH030C432P
VEAH036C432P
VEAH042C432P
VEAH048C432P
VEAH054C432P
4.3.2 Piping Preparation
All cut ends are to be round, burr free, and cleaned. Failure to follow this practice
increases the chances for refrigerant leakage.
(A)
Fig 4.2
Gas Pipe(in)
5/8
5/8
5/8
5/8
5/8
5/8
Fig 4.3
10
(B)
External Diameter (inch)
Liquid Pipe(in)
VRF DC Air Handler
3/8
3/8
3/8
3/8
3/8
3/8