Installation; Unpacking The Product; Installation Premises; Assembly - Riello 20156553 Manual

Table of Contents

Advertisement

Available languages
  • EN

Available languages

  • ENGLISH, page 12

INSTALLATION

8 UNPACKING THE PRODUCT

Package content
1
9
1
Solar Station
2
Gasket
3
Safety unit
4
Pump power cable
5
Cable for managing and controlling the speed of the PWM
pump
6
Dowels (8mm)
7
Fixing screws (8mm)
8
Hose holder with locking ring (3/4" x 14)
In a plastic bag, the following material is also supplied:
9
Instruction manual
9
The instruction manual is an integral part of the boiler. Once
located, read it thoroughly and keep it safe.

9 INSTALLATION PREMISES

9
When installing the boiler, allow sufficient space around it
to access all safety and control devices and to permit easy
maintenance.
Installation
4
5
8
9.1
Recommended minimum distances
Recommended distances for assembly and maintenance are
300 mm on each side (including expansion tank).
Position the solar station at a height that makes the thermom-
eters easy to read.
2
3
7
6

10 ASSEMBLY

− Remove the front insulation (1)
− Mark mounting points (F) on the wall and drill
− Insert blocks
1
16 16
≥ 0
, 3
m
≥ 0
, 3
m
4 0
Ø 8
m m
F
m m
F

Advertisement

Table of Contents
loading

This manual is also suitable for:

20120499

Table of Contents