Honeywell MB12-BAT-SCN02 Quick Start Manual page 9

Multi-bay battery charging station
Table of Contents

Advertisement

Hardware Required
• DIN rail
• 3/16 in. dia. x 5/8 in. long pan head screw
• 1/2 in. OD x 7/32 in. ID x 3/64 in. thick flat washer
• 3/16 in. dia. nut
Installation
1.
Slide the DIN rail into the DIN rail slot on the bottom of the
charging station.
8

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Mb4-bat-scn02

Table of Contents