The Tower

It is recommended to install the wind turbine on an Independent tower, and
not next to the house to avoid turbulences.
Anchoring the tower is carried out according to
the type for installation, a n d m ust b e fixed
securely to the ground, normally with concrete
foundations. It m u s t b e totally vertical a n d
leveled to avoid poor wind turbine functioning.
In the case of shorter-based towers requiring tensile g u y cables: o n c e the
b a s e is a n c h o r e d a n d the t o w e r is in place, 3 o r 4 tensile g u y cables a r e
applied, their supports firmly anchored to the ground, generally in concrete
foundations.
Check at all times that your tower remains perfectly vertical.
The guys ropes have to absorb all tower bend in windy conditions. Therefore,
they m u s t b e 6 -1 0 m m diameter steel cables.
Attach the guy wires to the highest point of the
tower but always beneath the diameter of the
blades.
Grounding the tower will provide static and
lightning protection for the system. This can
be made by driving cooper wire into the
ground near the tower base and connecting it
to the tower with wire.
W e don't recom m end the installation of
lighting arrestors near to or within the area
occupied by the
wind turbine.
!
Check constantly to
ensure that the tower is
vertical and level.
CAUTION:
33

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Wind 13+ and is the answer not in the manual?

Related Products for Bornay Wind 13+

Table of Contents