Manson Engineering Industrial SBC-7208 User Manual page 10

Pv charge controller
Table of Contents

Advertisement

When the battery voltage becomes higher than Low Voltage Reconnect (LVR) setting for 5
minutes, the controller will automatically reconnect the load again.
The following chart shows the night light mode selections.
LCD Display
Explanation
OFF
OFF
2 HR ON
2 HOURS ON
4 HR ON
4 HOURS ON
6 HR ON
6 HOURS ON
8 HR ON
8 HOURS ON
10 HR ON
10 HOURS ON
3 / OFF / 1
3 / OFF / 1
4 / OFF /2
4 / OFF /2
6 / OFF /2
6 / OFF /2
DK--DN
Dusk to Dawn
DESCRIPTION:
OFF – Load remain turned off.
X Hours On – Load is turned on for X hours after sunset.
Y / OFF / Z – Load is turned on for Y hours after sunset, turned off during the night, then turned
on again Z hours before sunrise.
Dusk to Dawn – Load is turned on all night.
Measure Night Length
The load timer options that turn the load on again before sunrise require that the PV charge
controller to measure the length of the night. The default value of night length is 12 hours after
installation (or disconnect then reconnect the battery). The local length of night will take the
moving average of 4 consecutive nights.
If the solar array is disconnected during service, the controller will then record premature night
duration. This wrong night length data will be outdated after another 4 days of normal service.
Alternatively, the above error can be corrected by disconnect then reconnect the battery.
Verify Night-Light Mode selection
To verify the night-light mode selection. During night-light mode, press the reset button once.
The green LED will flash once per second. Count these LED flashes to confirm the correct
selection.
SUNSET
P.9
NIGHT
SUNRISE
Table 5

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sbc-7212Sbc-7220

Table of Contents