13) Remove the front insulation panel, then remove splash guard, cube guide B and cube
guide A.
Remove the overflow cap, overflow pipe, water shield, and drain plug. After the water
tank has drained, replace the drain plug, water shield, overflow pipe, overflow cap, cube
guide A, cube guide B, splash guard, and front insulation panel.
Sanitizing
14) To fill the water tank, turn the cleaning valve to the right until completely horizontal
(closed). Move the control switch to the "ICE" position, then replace the front panel.
After 3 min., remove the front panel, then move the control switch to the "OFF" position.
15) Remove the front insulation panel, then pour .78 fl. oz. (23 ml) of an 8.25% sodium
hypochlorite solution (chlorine bleach) into the water tank. Replace the front insulation
panel. Turn the cleaning valve to the left until completely vertical (open).
IMPORTANT! Use regular bleach with no additives. Using a bleach with additives
causes excessive foaming during sanitizing, reducing the effectiveness of
sanitizing.
16) NOTICE! To avoid excessive foaming, wait 1 min. before proceeding.
After 1 min., move the control switch to the "WASH" position, then replace the front
panel.
17) After 45 min., remove the front panel, then move the control switch to the "OFF"
position.
18) Remove the front insulation panel, then remove splash guard, cube guide B and cube
guide A. Remove the overflow cap, overflow pipe, water shield, and drain plug. After the
water tank has drained, replace the drain plug, water shield, overflow pipe, overflow cap,
cube guide A, cube guide B, splash guard, and front insulation panel.
Sanitizing Rinse 1
19) Turn the cleaning valve to the right until completely horizontal (closed). Move the control
switch to the "ICE" position, then replace the front panel. After 3 min., remove the front
panel, then move the control switch to the "OFF" position.
20) Turn the cleaning valve to the left until completely vertical (open). Move the control
switch to the "WASH" position, then replace the front panel. After 5 min., remove the
front panel, then move the control switch to the "OFF" position.
21) Remove the front insulation panel, then remove splash guard, cube guide B and cube
guide A. Remove the overflow cap, overflow pipe, water shield, and drain plug. After the
water tank has drained, replace the drain plug, water shield, overflow pipe, overflow cap,
cube guide A, cube guide B, splash guard, and front insulation panel.
Sanitizing Rinse 2
22) Turn the cleaning valve to the right until completely horizontal (closed). Move the control
switch to the "ICE" position, then replace the front panel. After 3 min., remove the front
panel, then move the control switch to the "OFF" position.
23) Turn the cleaning valve to the left until completely vertical (open). Move the control
switch to the "WASH" position, then replace the front panel. After 5 min., remove the
front panel, then move the control switch to the "OFF" position.
32