Payne PG96XAT Installation, Start-Up, Operating And Service And Maintenance Instructions page 27

Two-stage 4-way multipoise condensing gas furnace
Table of Contents

Advertisement

PERFORATED
DISCHARGE DUCT
FLANGE
SCREWS (2)
Representative drawing. Models may vary.
1.
Lay furnace on the back or side
2.
Remove the two (2) screws that secure the bottom
closure panel to the furnace casing and remove the
panel
Fig. 22 - - Removing Bottom Closure Panel (2 Screws)
UPFLOW
90°
YES
YES
120°
MIN
NO
Fig. 21 - - Duct Flanges
BOTTOM
CLOSURE
A170123
DOWNFLOW
YES
YES
120°
MIN
NO
SCREWS (4)
BOTTOM
PLATE
Representative drawing. Models may vary.
1.
Lay furnace on the back or side
2.
Remove the four (4) screws that secure the bottom
plate to the furnace casing
3.
Remove the bottom closure from the casing
4.
Re- install the bottom plate to the furnace casing and
re- install the four (4) screws
Fig. 23 - - Removing Bottom Closure Panel (4 Screws)
27
HORIZONTAL
90°
YES
YES
120°
MIN
NO
A10493
A170124

Advertisement

Table of Contents
loading

Table of Contents