Carrier WeatherMaker 8000 58YAV Installation, Start-Up, And Operating Instructions Manual page 19

Upflow induced-combustion furnaces
Table of Contents

Advertisement

LOAD CALCULATION
____________
Heating Load (Btuh)
____________
Cooling Load (Btuh)
____________
Furnace Model Selection
AIR FOR COMBUSTION AND VENTILATION
____________
Unconfined Space
____________
Confined Space
VENTING
____________
NFGC (United States)
____________
NSCNGPIC (Canada)
____________
Local Codes
____________
1/4-in. Upward Slope
____________
Joints Secure
____________
See Attached Vent Table Instructions
CHECKLIST—INSTALLATION
____________
____________
____________
____________
____________
____________
____________
____________
____________
____________
19
CHECKLIST—START-UP
Gas Input Rate
(Set Within 2 percent of Rating
Plate)
Temperature Rise Adjusted
Thermostat Anticipator Setting Ad-
justed or
Thermostat Cycle Rate (3 cycles per
Hr)
CHECK SAFETY CONTROLS OPERATION
Primary Limit
Pressure Switches
Draft Safeguard Switch
Auxiliary Limit Switch(es)
THERMOSTAT
Manufacturer Name
Model Number

Advertisement

Table of Contents
loading

Table of Contents