Installing A Hardware Loadmaster; Connect And Power On The Equipment; Configure Networking - KEMP Technologies LoadMaster Installation Manual

Table of Contents

Advertisement

Hardware LoadMaster

2 Installing a Hardware LoadMaster

2 Installing a Hardware
LoadMaster
A hardware LoadMaster package includes the following items:
Hardware LoadMaster appliance
Power cable
Serial cable
Mounting brackets
Serial cables are not included with LM-4000 models.

2.1 Connect and Power On the Equipment

To connect and power on the LoadMaster, follow the steps below:
1. Install into a 19-inch rack or another safe location.
2. Connect the Ethernet cable(s) to the port(s) on the LoadMaster.
For single arm setups, the switch only needs to be connected
to port 0.
3. Connect a monitor and keyboard to the LoadMaster (or just a serial cable).
4. Connect the power cable to the LoadMaster.
5. Turn on power to the unit.

2.2 Configure Networking

If you do not have the ability to connect to the LoadMaster
using a VGA or serial connection, skip to the License and
Configure the LoadMaster section. The default IP address for
the unit is 192.168.1.101.
kemp.ax
5
Copyright 2002-2021, Kemp Technologies, All Rights Reserved

Advertisement

Table of Contents
loading

Table of Contents