GSI Group BFT Series Assembly Manual

GSI Group BFT Series Assembly Manual

6', 7' and 9' bulk feed tanks

Advertisement

Quick Links

6', 7' and 9' Bulk Feed Tanks
BFT and GHT Series
Assembly Manual
PNEG-256
Date: 09-24-09
PNEG-256

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the BFT Series and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for GSI Group BFT Series

  • Page 1 6', 7' and 9' Bulk Feed Tanks BFT and GHT Series Assembly Manual PNEG-256 Date: 09-24-09 PNEG-256...
  • Page 2 All information, illustrations, photos, and specifications in this manual are based on the latest information available at the time of publication. The right is reserved to make changes at any time without notice. PNEG-256 6', 7' and 9' Bulk Feed Tanks...
  • Page 3: Table Of Contents

    Table of Contents Contents Chapter 1 Introduction ............................4 Chapter 2 Safety ..............................5 Safety Guidelines ..........................5 General Safety Statement ........................6 Safety Instructions ..........................7 Proper Storage of Grain Bin/Silo Materials Prior to Construction ............9 Chapter 3 Decals ............................... 10 Chapter 4 General Information ........................
  • Page 4: Chapter 1 Introduction

    1. Introduction READ THIS MANUAL carefully to learn how to properly use and install equipment. Failure to do so could result in personal injury or equipment damage. INSPECT the shipment immediately upon arrival. The customer is responsible for ensuring that all quantities are correct.
  • Page 5: Chapter 2 Safety

    2. Safety Safety Guidelines This manual contains information that is important for you, the owner/operator, to know and understand. This information relates to protecting personal safety and preventing equipment problems. It is the responsibility of the owner/operator to inform anyone operating or working in the area of this equipment of these safety guidelines.
  • Page 6: General Safety Statement

    2. Safety General Safety Statement Our foremost concern is your safety and the safety of others associated with grain handling equipment. This manual is to help you understand safe operating procedures and some problems which may be encountered by the operator and other personnel. As owner and/or operator, you are responsible to know what requirements, hazards and precautions exist and inform all personnel associated with the equipment or in the area.
  • Page 7: Safety Instructions

    2. Safety Safety Instructions Our foremost concern is your safety and the safety of others associated with this equipment. We want to keep you as a customer. This manual is to help you understand safe operating procedures and some problems which may be encountered by the operator and other personnel. As owner and/or operator, it is your responsibility to know what requirements, hazards and precautions exist, and to inform all personnel associated with the equipment or in the area.
  • Page 8 2. Safety Prepare for Emergencies Be prepared if fire starts. Keep a first aid kit and fire extinguisher handy. Keep emergency numbers for doctors, ambulance service, hospital and fire department near your telephone. Keep Emergency Equipment Quickly Accessible Wear Protective Clothing Wear close fitting clothing and safety equipment appropriate Eye Protection to the job.
  • Page 9: Proper Storage Of Grain Bin/Silo Materials Prior To Construction

    2. Safety Proper Storage Grain Bin/Silo Materials Prior to Construction Wet storage stain (rust) will develop when closely packed bundles of galvanized material, such as sidewall and roof sheets, have moisture present. Inspect roof and sidewall bundles on arrival for any moisture.
  • Page 10: Chapter 3 Decals

    3. Decals DC-604 DC-604 Located on the cap latch control arm. PNEG-256 6', 7' and 9' Bulk Feed Tanks...
  • Page 11 3. Decals Wire tie PNEG-256 6', 7' and 9' Bulk Feed Tanks...
  • Page 12 3. Decals DC-GBC-1A Located on inside the peak cap. Rotating flighting will Flowing material will Crusted material will kill or dismember. trap and suffocate. collapse and suffocate. Keep clear of all augers. DO NOT ENTER this bin! If you must enter the bin: 1.
  • Page 13: Chapter 4 General Information

    4. General Information Bulk Feed Tank Assembly Manual General Instructions This product is intended for the use of storing feed only. Any other use is a misuse of the product. While every effort has been made to prevent sharp edges, always wear the proper protective clothing while erecting the bulk feed tank.
  • Page 14 4. General Information Selecting the Proper Site The selected site should be level, firm and free from underlying debris. The tank can be installed satisfactorily on slopes, but as the slope increases, additional labor and materials are required for the foundation.
  • Page 15 NOTES PNEG-256 6', 7' and 9' Bulk Feed Tanks...
  • Page 16: Chapter 5 Foundation

    5. Foundation Figure 5A PNEG-256 6', 7' and 9' Bulk Feed Tanks...
  • Page 17 5. Foundation Figure 5B PNEG-256 6', 7' and 9' Bulk Feed Tanks...
  • Page 18 5. Foundation Figure 5C PNEG-256 6', 7' and 9' Bulk Feed Tanks...
  • Page 19 5. Foundation Figure 5D PNEG-256 6', 7' and 9' Bulk Feed Tanks...
  • Page 20 5. Foundation Figure 5E PNEG-256 6', 7' and 9' Bulk Feed Tanks...
  • Page 21 5. Foundation Figure 5F PNEG-256 6', 7' and 9' Bulk Feed Tanks...
  • Page 22: Chapter 6 Sidewall Assembly

    6. Sidewall Assembly Tank Side Walls Sidewall Sheet Gauge Chart Model Gauge BFT 6'-1 Ring BFT 6'-2 Ring 20-20 BFT 6'-3 Ring 18-20-20 BFT 6'-4 Ring 18-20-20-20 BFT 7'-1 Ring BFT 7'-2 Ring 18-20 BFT 7'-3 Ring 18-20-20 BFT 7'-4 Ring 18-18-20-20 BFT 7'-5 Ring 17-17-18-20-20...
  • Page 23 6. Sidewall Assembly Caulking Figure 6A Caulking Detail NOTE: Apply rope caulking to each sheet prior to assembling. Wipe sheet clean where the caulk is to be applied. Apply caulking on each side of the holes on the vertical seams and also on each side of the horizontal row of holes as shown in Figure 6B below.
  • Page 24: Sidewall Sheet Orientation

    6. Sidewall Assembly Sidewall Sheet Orientation IMPORTANT: Please note the sheet orientation when assembling the bin sidewall. The upper right corner will have a slot or identifying sticker. This corner should be on the inside of the tank when assembled. See slot detail Figure 6C Viewed from Inside Sheet orientation will effect how the sheets lap together.
  • Page 25 6. Sidewall Assembly Figure 6D Ring Overlap Detail Tighten ALL bolts from the nut side ONLY. Figure 6E First Ring Assembly IMPORTANT: Begin bolting in the center of the sheet. When starting to assemble the sidewall rings to one another, be sure to start in the center of the sheet and work to the outside edges (horizontal seams).
  • Page 26 6. Sidewall Assembly Figure 6F Sidewall Assembly It is easier to assemble additional sidewall sheets with the tank on its side. It can be rolled easily from side to side to allow the bolts and nuts to be placed in the proper holes. (Note that the roof must be assembled on the first ring BEFORE rolling the tank to its side for continued sidewall sheet assembly.) PNEG-256 6', 7' and 9' Bulk Feed Tanks...
  • Page 27: Chapter 7 Roof

    7. Roof Sealed Roof Panels Installation Note that the roof and sidewall ladders are centered on a roof seam. When placing a roof panel, note that the outside edge is bent down. This edge should be located on the outside of other roof panel to form a tight seal.
  • Page 28: Peak Ring

    7. Roof Peak Ring Peak Ring Collar to Roof Panels Use two (2) strips of caulking between peak ring and roof panels (See Figure 7E). Note that the peak ring goes on the outside of the roof panels. Figure 7D Peak Ring Collar Detail Peak ring Caulking 5/16'' x 3/4'' Bin bolt...
  • Page 29: Eave Safety Rail (6')

    7. Roof Eave Safety Rail (6') See Figure 7H on Page 30 See Figure 7I on Page 30 See Figure 7J on Page 30 Figure 7G 6' Roof Eave Safety Rail Detail 6' Roof Eave Safety Rail Parts List Ref # Part # Description 6' Diameter...
  • Page 30 7. Roof Figure 7H Figure 7I Figure 7J PNEG-256 6', 7' and 9' Bulk Feed Tanks...
  • Page 31: Eave Ladder

    7. Roof Eave Ladder NOTE: Ladder is symmetrical across roof seam. One side shown for clarity. Figure 7K 7' and 9' Roof Eave Ladder Detail 7' and 9' Roof Eave Ladder Parts List Ref # Part # Description 7' Diameter 9' Diameter BLK-11680 Ladder Eave Safety Ring...
  • Page 32: Peak Ring (Ladder)

    7. Roof Figure 7L Peak Ring (Ladder) Figure 7M 7'-9' Roof Ladder Peak Ring Detail PNEG-256 6', 7' and 9' Bulk Feed Tanks...
  • Page 33 7. Roof NOTE: Three (3) hole spaces on either side of center line of ladder. (Six (6) spaces between brackets.) Figure 7N 7' and 9' Roof Eave Ladder Detail Ref # Part # Description 7' Diameter 9' Diameter LS-147 Inside Ladder Standoff BLK-11760 7' BFT Roof Ladder Support Channel BLK-11761...
  • Page 34: Cap

    7. Roof Roof Cap Ground Control See Figure 7P See Figure 7Q on Page 35 See Figure 7R on Page 35 Figure 7O Ground control comes standard on 6'-60°, 7-67° and 9'-60° bulk feed tanks. Ground control is optional on all 45° bulk feed tanks. Ground control components come fully assembled for the convenience. The ground control is shipped with the control arm secured for safety and shipping purposes.
  • Page 35 7. Roof Cap (Continued) Refer to Figure 7T on Page 36 Figure 7W on Page 38 for component part assembly. The cap latch hook, located opposite to the cap hinge, latches over the hold down bracket (BLK-11846) (Ref #20, Figure 7U on Page 37).
  • Page 36 7. Roof Cap (Continued) Bolt the chain holder (BLK-11949) to the bottom horizontal row of sidewall holes, or field drill and bolt to the leg tie brace. (See Figure 7R on Page 35.) Two (2) 4'' plastic handles and extra key ring clips are provided for use at the hopper eave to be used as fully open and fully closed cap indicators.
  • Page 37 7. Roof Figure 7U Ground Control Detail Control Arm and Ground Control Parts List Ref # Part # Description BLK-11735 Control Arm BLK-11876 Nylon Grommet with Nut BLK-11623 Flush Cap Main Spring S-277 5/16''-18 x 1-1/4" Bin Bolt (Grade 5) S-845 5/16'' Wrought Iron Washer (Grade 2) BLK-11842...
  • Page 38: Peak Ring

    7. Roof Peak Ring Bulb seal (BLK-10472) Figure 7V Bulb Seal Kit (optional) Figure 7W Cap Hold Down Package NOTE: Bulb seal kit is included with all pneumatic fill kits. When ordered as a separate option, specify part # BLK-10472. Cap hold down package comes standard on all 45°...
  • Page 39: Chapter 8 Hopper Assembly

    8. Hopper Assembly Hopper Sheets When starting to attach hopper sheets to sidewall, the first hopper sheet seam should be positioned halfway between leg positions. Lap the hopper sheets as shown in Figure 8F Figure 8G on Page Use two (2) strips of caulking on all seams at sidewall to hopper and hopper sheet to hopper sheet. Be sure to place the head of the truss bolt on the inside of hopper.
  • Page 40 8. Hopper Assembly Hopper sheet to sidewall sheet Figure 8B Figure 8C PNEG-256 6', 7' and 9' Bulk Feed Tanks...
  • Page 41 8. Hopper Assembly 9' 60° Leg Attachment (for 9' 60° Tanks Only) Curved washers are supplied in the hardware packages. These washers must be installed at the bottom leg to sidewall bolt connection, to the inside of the hopper panel as indicated in the Figure 8D below.
  • Page 42 8. Hopper Assembly Figure 8F Hopper Overlap and Bolt Detail w/ Reinforcement Angle Figure 8G Hopper Overlap and Bolt Detail for Tanks w/out Reinforcement Angle PNEG-256 6', 7' and 9' Bulk Feed Tanks...
  • Page 43 8. Hopper Assembly Reinforcement Angles NOTE: Every hole in the hopper sheet will be utilized. Use 5/16" x 3/4" truss head bolt on hopper seams. (Truss head goes on inside of hopper). The 9' 3-6 ring, 60° and 7' 5-6 ring, 67° ring tanks are the only ones to use reinforcement angles. NOTE: Last (bottom) bolt in reinforcement angle goes through hopper collar also.
  • Page 44 8. Hopper Assembly Figure 8I Bolt Detail: Hopper Extension (if used) Figure 8J Bolt Detail: Hopper Collar PNEG-256 6', 7' and 9' Bulk Feed Tanks...
  • Page 45 8. Hopper Assembly Install hopper collar before all hopper panels are assembled. Use 5/16" x 3/4" truss head bolts, as shown Figure 8I Figure 8J on Page 44, on all hopper seams. Be sure to caulk between the hopper collar and hopper panels.
  • Page 46 8. Hopper Assembly Figure 8M Hopper Extension Kits Part # Description BLK-10847 16" 45° Hopper Extension and Collar (Standard on 9' 45°) BLK-10587 16" 60° Hopper Extension and Collar (Optional) BLK-10591 16" 67° Hopper Extension and Collar (Optional) PNEG-256 6', 7' and 9' Bulk Feed Tanks...
  • Page 47: Chapter 9 Legs And Leg Braces

    9. Legs and Leg Braces Tank Legs and Leg Braces When installing legs to sidewall, reverse the normal insertion procedure on bolts. Place hex head and neoprene washer to inside of sidewall, leaving threaded portion of bolt protruding outward. This provides for a weather tight seal at the leg attachment location.
  • Page 48 9. Legs and Leg Braces Line up leg with these holes and bolt (refer Figure 9C below) 6' tank leg shown. Figure 9C Figure 9D PNEG-256 6', 7' and 9' Bulk Feed Tanks...
  • Page 49 9. Legs and Leg Braces Figure 9E Leg Size Chart Tank Size Hopper Rings # Length Leg Coverage (Diameter) 60° 106-3/8'' 1 Ring 60° 106-3/8'' 1 Ring 67° 140-1/2'' 1 Ring 67° 164-1/2'' 1-3/4 Ring (56'') 60° 140-1/2'' 1 Ring 60°...
  • Page 50 9. Legs and Leg Braces 1 Ring Leg 140-1/2'' (3569 mm) Figure 9F Leg Adjustment (7' (1-4 ring) 67° and 9' (1-5 ring) 60° only) NOTE: 9' 5 Ring tanks must utilize two (2) ring coverage legs if raising 8" (203.2 mm). Failure to follow instructions may cause damage or failure of the equipment.
  • Page 51 9. Legs and Leg Braces Bracing Hole Layout (60° and 67° Legs) For 7' 67° and 9' 60° feed tank bracing layout. (See Figure 9I on Page 52 Figure 9J on Pages 53.) Leg adjustment (7' (5-6 ring) 67° and 9' (6 ring) 60° only) 2 ring leg 164-1/2" (4178 mm) Figure 9G Figure 9H PNEG-256 6', 7' and 9' Bulk Feed Tanks...
  • Page 52 9. Legs and Leg Braces Figure 9I PNEG-256 6', 7' and 9' Bulk Feed Tanks...
  • Page 53 9. Legs and Leg Braces Figure 9J PNEG-256 6', 7' and 9' Bulk Feed Tanks...
  • Page 54 9. Legs and Leg Braces Hopper to Leg Horizontal Bracing BFT Brace Quantity Inside Cross Outside Cross Tank Description Hopper Brace Tie Brace Tie Brace 6' Diameter 60° Hopper 7' Diameter 67° Hopper 9' Diameter 60° Hopper 9' Diameter 45° Hopper ** 6' 60°...
  • Page 55 9. Legs and Leg Braces Refer to the chart below for the quantities required. Brace Part # Brace Part # Tank (16'' Hopper) (22'' Hopper) 6' 60° BLK-12146 BLK-12147 7' 67° BLK-12107 BLK-12108 9' 60° BLK-12109 BLK-12110 9' 45° BLK-12111 BLK-12112 NOTE: Hopper braces attach between the legs and the collar/hopper horizontal seam.
  • Page 56: Chapter 10 Ladder

    10. Ladder Optional Sidewall Ladder Instructions To start sidewall ladder, place two (2) outside standoffs spaces 18-3/4" (476 mm) apart. At the roof eave, the ladder should be located on the standoffs. (Refer to Figure 10B on Page 57.) Continue with standoff located on every horizontal seam.
  • Page 57 10. Ladder Figure 10B Ladder Standoff Detail Note locations of legs and other ring’s horizontal hole spacing when placing ladder. Ladder section Ladder standoff Ladder standoff Lower ladder section will overlap upper ladder section’s offset. Each side is bolted together by two (2) 5/16" x 3/4" bolts and 5/16" nut. Figure 10C PNEG-256 6', 7' and 9' Bulk Feed Tanks...
  • Page 58: Safety Cage

    10. Ladder Safety Cage Ladder and Safety Cage Usage Chart (Number in chart specifies ring size) Ladder Safety 6' 60° 7' 67° 9' 60° 9' 45° Package # Cage # BLK-10824 BLK-10630 BLK-10831 BLK-10634 BLK-10832 BLK-10635 BLK-10833 BLK-10640 BLK-10835 BLK-10637 BLK-10836 BLK-10641 BLK-10837...
  • Page 59 10. Ladder Figure 10E Safety Cage Assembly PNEG-256 6', 7' and 9' Bulk Feed Tanks...
  • Page 60: Chapter 11 Raising Bin

    11. Raising Bin Raising Bin to set on Foundation Preparing Bin Prior to standing the bin upright, peel protective mask off the decal while it is easy to reach. Mask may become difficult to remove if exposed to sunlight. Check for all possible overhead obstructions, power line, etc., BEFORE standing the bin on the foundation.
  • Page 61 11. Raising Bin Raising Bin to set on Foundation (Continued) Be sure that all bolts are tightened properly. Bulk feed tank can now be set up on foundation. Small bulk feed tanks may be set up with manpower. As the tanks get taller and heavier, other means must be used to raise the bulk feed tank.
  • Page 62 11. Raising Bin Figure 11C Leg Base Detail NOTE: Leg shims are not standard equipment and must be obtained locally. PNEG-256 6', 7' and 9' Bulk Feed Tanks...
  • Page 63: Chapter 12 Grounding

    12. Grounding Bin Grounding Instructions NOTE: Parts not supplied by manufacturer and must be purchased locally. All bins should have two (2) ground connections. Ground clamps must be placed at equal distances around the bin. Alternate installation: Cables may be placed in the foundation or through PVC sleeve inserted in the slab during construction.
  • Page 64: Chapter 13 Pneumatic Fill Kit

    13. Pneumatic Fill Kit Roof Panel Identical pre-punched roof panels are available from the manufacturer for inlet and outlet sections of pneumatic fill systems. Extruded lip of the panels provide for weather tight installation. Caulking placed between angle rings virtually eliminates all leakage issues. Rubber seal must be utilized at roof cap area to prevent material “blow by”...
  • Page 65 13. Pneumatic Fill Kit Figure 13B PNEG-256 6', 7' and 9' Bulk Feed Tanks...
  • Page 66 NOTES PNEG-256 6', 7' and 9' Bulk Feed Tanks...
  • Page 67: Chapter 14 Parts List

    14. Parts List 1. 6' Diameter 60° Hopper Bin Specifications 2. 6' Diameter 60° Hopper Bin Hardware Specifications 3. 7' Diameter 67° Hopper Bin Specifications 4. 7' Diameter 67° Hopper Bin Hardware Specifications 5. 9' Diameter 60° Hopper Bin Specifications 6.
  • Page 68: 6' Diameter 60° Hopper Bin Specifications

    14. Parts List 6' Diameter 60° Hopper Bin Specifications Under Collar Clearance 16" Collar 28-5/16" (719 mm) 22" Collar 32-7/8" (837 mm) IMPORTANT: Bolt heads are inside of bin at the leg to body attachment and on all vertical seams on hopper panels.
  • Page 69 14. Parts List 6' Diameter 60° Hopper Bin Specifications Parts List Ref # Part # Description BLK-12254 6' 30° Roof Panel (20 Gauge) (Shown) BLK-12257 6' 40° Roof Panel (20 Gauge) 6' Sidewall Sheet 2 Per Ring SS40682006 20 Gauge (Top Punched Sidewall Sheet) SS41632006 20 Gauge (Top Punched Decal Sidewall Sheet) SS40672006...
  • Page 70: 6' Diameter 60° Hopper Bin Hardware Specifications

    14. Parts List 6' Diameter 60° Hopper Bin Hardware Specifications PNEG-256 6', 7' and 9' Bulk Feed Tanks...
  • Page 71 14. Parts List 6' Diameter 60° Hopper Bin Hardware Specifications Parts List Ref # Part # Description S-275 Bulk Tank Peak Ring to Roof Panels (Use 5/16" x 3/4" Hex Head Bin Bolts and 5/16" Hex Nuts.) S-396 S-275 Roof Panel to Roof Panel (Use 5/16" x 3/4" Hex Head Bin Bolts and 5/16"...
  • Page 72: 7' Diameter 67° Hopper Bin Specifications

    14. Parts List 7' Diameter 67° Hopper Bin Specifications Under Collar Clearance 16" Collar 30-3/8" (771 mm) 22" Collar 36-1/2" (927 mm) PNEG-256 6', 7' and 9' Bulk Feed Tanks...
  • Page 73 14. Parts List IMPORTANT: Vertical seams of body sheets with leg holes MUST be bolted together to provide 65-5/8" (1667 mm) between leg holes. IMPORTANT: Bolt heads are inside of bin at the leg to body attachment and on all vertical seams on hopper panels.
  • Page 74: 7' Diameter 67° Hopper Bin Hardware Specifications

    14. Parts List 7' Diameter 67° Hopper Bin Hardware Specifications PNEG-256 6', 7' and 9' Bulk Feed Tanks...
  • Page 75 14. Parts List 7' Diameter 67° Hopper Bin Hardware Specifications Parts List Ref # Part # Description S-275 Bulk Tank Peak Ring to Roof Panels (Use 5/16" x 3/4" Hex Head Bin Bolts and 5/16" Hex Nuts.) S-396 S-275 Roof Panel to Roof Panel (Use 5/16" x 3/4" Hex Head Bin Bolts and 5/16"...
  • Page 76: 9' Diameter 60° Hopper Bin Specifications

    14. Parts List 9' Diameter 60° Hopper Bin Specifications Under Collar Clearance 16" Collar 28-1/16" (713 mm) 22" Collar 32-5/8" (829 mm) IMPORTANT: Bolt heads are inside of bin at the leg to body attachment and on all vertical seams on hopper panels.
  • Page 77 14. Parts List 9' Diameter 60° Hopper Bin Specifications Parts List Ref # Part # Description BLK-12266 9' 30° Roof Panel (20 Gauge) (Shown) BLK-12269 9' 40° Roof Panel (20 Gauge) 9' Sidewall Sheet 3 Per Ring SS40682009 20 Gauge (Top Punched Sidewall Sheet) SS41662009 20 Gauge (Top Punched Decal Sidewall Sheet) SS40692009...
  • Page 78: 9' Diameter 60° Hopper Bin Hardware Specifications

    14. Parts List 9' Diameter 60° Hopper Bin Hardware Specifications PNEG-256 6', 7' and 9' Bulk Feed Tanks...
  • Page 79 14. Parts List 9' Diameter 60° Hopper Bin Hardware Specifications Parts List Ref # Part # Description S-275 Bulk Tank Peak Ring to Roof Panels (Use 5/16" x 3/4" Hex Head Bin Bolts and 5/16" Hex Nuts.) S-396 S-275 Roof Panel to Roof Panel (Use 5/16" x 3/4" Hex Head Bin Bolts and 5/16"...
  • Page 80: 9' Diameter 45° Hopper Bin Specifications

    14. Parts List 9' Diameter 45° Hopper Bin Specifications Under Collar Clearance 16" Collar 30-11/16" (779 mm) 22" Collar 33-1/4" (844 mm) IMPORTANT: Bolt heads are inside of bin at the leg to body attachment and on all vertical seams on hopper panels.
  • Page 81 14. Parts List 9' Diameter 45° Hopper Bin Specifications Parts List Ref # Part # Description BLK-12266 9' 30° Roof Panel (20 Gauge) (Shown) BLK-12269 9' 40° Roof Panel (20 Gauge) 9' Sidewall Sheet 3 Per Ring SS40682009 20 Gauge (Top Punched Sidewall Sheet) SS41662009 20 Gauge (Top Punched Decal Sidewall Sheet) SS40692009...
  • Page 82: 9' Diameter 45° Hopper Bin Hardware Specifications

    14. Parts List 9' Diameter 45° Hopper Bin Hardware Specifications PNEG-256 6', 7' and 9' Bulk Feed Tanks...
  • Page 83 14. Parts List 9' Diameter 45° Hopper Bin Hardware Specifications Parts List Ref # Part # Description S-275 Bulk Tank Peak Ring to Roof Panels (Use 5/16" x 3/4" Hex Head Bin Bolts and 5/16" Hex Nuts.) S-396 S-275 Roof Panel to Roof Panel (Use 5/16" x 3/4" Hex Head Bin Bolts and 5/16"...
  • Page 84 NOTES PNEG-256 6', 7' and 9' Bulk Feed Tanks...
  • Page 85: Chapter 15 Warranty

    GSI Group, LLC Limited Warranty The GSI Group, LLC (“GSI”) warrants products which it manufactures to be free of defects in materials and workmanship under normal usage and conditions for a period of 12 months after sale to the original end-user or if a foreign sale, 14 months from arrival at port of discharge, whichever is earlier.
  • Page 86 Authorities having jurisdiction should be consulted before installations are made. GSI Group 1004 E. Illinois St. Assumption, IL 62510-0020 Phone: 1-217-226-4421 Fax: 1-217-226-4420 www.gsiag.com Copyright © 2009 by GSI Group Printed in the USA...