Download Print this page
Rossi DZ GHT9 Installation Manual

Rossi DZ GHT9 Installation Manual

Advertisement

Quick Links

GHT Sliding Line
High flow
Installation
1st - Observe if the gate is sliding freely along its entire route, observing
the support guide, rail, stops and pulleys, if not, correct it before installing
the automator.
2nd - Provide a power and grounding point, passing a conduit, starting
from the automator to the power panel with a 10A bipolar circuit breaker.
NOTE: It is mandatory to install a disconnection device (bipolar
circuit breaker with minimum contact opening equal to 3mm)
which must be incorporated into the attached wiring. 3rd - Provide
the means by which you want to secure the automator.
• Concrete base • Metal base • French hand (air base) never upside
down.
Use the measurements in the manual to mark the location of the screws.
4th - Place 2mm spacers (Ex. washers) on the base, screw the
automation device on the spacers and put the actuator in manual mode.
5th - Close the gate, support the rack on the gear and attach the bar to
the gate with welding or screw, every 30 cm.
6th - After the racks are attached, remove the spacers placed on the
base and attach the automator again, and check the spaces between the
rack and the gear.
NOTE: " The spacers placed at the beginning of the attaching of the racks
serve to give the mandatory minimum height of 2mm between the rack
and the external gear of the automator.
1
Photocell x-ray
3
Rev. E - COD. 14934
"
support guide
Pulleys
4
Smart Products
KXGHT
NOTE: " Failure to observe this distance can cause wear on the internal and
external gears of the automator or the rack to break when the automator
starts."
7th - Adjust the limit switches in FA open and FF closed mode, placing a
magnet on each end of the rack angle, observing the polarity of each magnet
between the open and closed gate.
NOTE: " The magnets must always be attached to the angle, even during
the opening and closing adjustments to avoid damage to the control
panel"
8th - Attaches the control unit to the support guide inside the automator
(instructions for attaching Page2).
9th - HALL sensor limit switch
The hall sensor identifies the polarity of the magnets, north and south.
(instructions Page 6)
NOTE: For bench tests, it must simulate the movement of the magnet
installed in the gate, remembering that when activating the control, the
limit switch must be active.
When installing and adjusting the magnets, in the first two commands,
the control unit must recognize the FA and FF magnets.
10th - It is MANDATORY to use the Active Infrared Sensor - SIA 30 FS or XP20WD
wireless FAAC to activate the anti-trapping protection system, avoiding collision
with obstacles, accidents with people or material goods.
11th - Gates and automations need periodic maintenance and lubrication
every 6 months for proper functioning.
Photocell TX
Rail and Stop
5
Attachment points
www.rossiportoes.com.br
SIA 30/ XP20WD FAAC
2
Circuit breaker
6
2mm
Pag. 1

Advertisement

loading
Need help?

Need help?

Do you have a question about the DZ GHT9 and is the answer not in the manual?

Questions and answers

Summary of Contents for Rossi DZ GHT9

  • Page 1 Smart Products GHT Sliding Line KXGHT SIA 30/ XP20WD FAAC High flow Installation NOTE: " Failure to observe this distance can cause wear on the internal and external gears of the automator or the rack to break when the automator 1st - Observe if the gate is sliding freely along its entire route, observing starts."...
  • Page 2: Installation Notes

    The encoder must be properly Attaching the control affixed to the base for a perfect operation. Hall Encoder magnet Measurements in mm GHT Model 9 module 4 Z12 GHT9 Model module 4 Z17 GHT Model 9 module 6 Z12 GHTI Model 12 module 6 Z15 Model GHTI 16 module 6 Z12 Model GHTI 22 module 6 Z15 GHT CHAIN Model...
  • Page 3: Warranty Term

    4th - Use the remote controls only if you can see the automatic gate. 5th - Warning: ROSSI does not assume any responsibility for any damage caused by non-observance, at the time of installation, of the safety standards and the laws currently in effect. NBR 5410:1997 - ABNT - Brazilian Association of Technical Standards.
  • Page 4 U/V/W - Motor Wires (U = Core, yellow wire) -------------------------------------------------------------------------------------------------------------- -------------------------------------------------------------------------------------------------------- ST - Event Indicator LED 12V - 12.8VDC -300mA output (for ROSSI accessories) FA - Green Led Open Gate Indicator GND - Core for 12V Output and Accessories FF – Red Led Gate Closed Indicator...
  • Page 5 1- F.SAFE 2 - ENC - WITH ENCODER-If the dip switch is in ENC mode, the control unit will only work with a Rossi physical encoder. This function was developed to work with LINE GHT 2- ENC/Ñ...
  • Page 6: Putting Into Operation

    1 - Gate Set DIP 2 to OFF, ENC (WITH ENCODER) and DIP 3 to LV /PS (LIGHT / HEAVY) according to your application and record a Rossi control to the control panel. Note: connect the J9 encoder terminal 2 - Setup Press and hold the ADJUSTMENTS button for 5 seconds until the ST led starts to flash and release the button, then the automatic route recognition process starts at a slow speed;...

This manual is also suitable for:

Dz ght9 turboDz ghti 16 turboDz ghti 12 turbo+Dz ghti 22