Global Industrial Starter Assembly Instructions

Open industrial shelving

Advertisement

Customer Service
1-800-645-2986

Tools Required:

7
/
" nut driver or socket
16
• Flathead screwdriver.
• Requires two people
for assembly.
• Approximate assembly time:
15 to 30 minutes per unit.
Note: Number of shelves
per unit varies depending
on unit purchased.
1.
Create the right side of the shelving units by laying two uprights side-by-side on a flat surface.
Be sure that the short side of the uprights is facing up, as shown in Figure 1.
Important: One side of the uprights
is longer that the other, and contains
two sets of holes. When laying the
uprights side-by-side, this long side
should be on the floor, and the short
side should be facing up.
2.
Attach the two side sway braces, beginning in the 20th
hole from the top of each upright (approximately 20" from the top),
/
/
using two
"-20 x
" bolts and nuts. The side sway braces attach
1
5
4
8
to the longer side of the uprights (the side with two sets of holes). Bolt
the braces into the small holes near the edge of the uprights as shown.
Note the hole pattern of two round holes and then one square hole,
repeating every 3", which should help facilitate proper placement of the
bolts. Finger tighten only at this point.
3.
Attach the other end of both sway braces. The information below will
tell how many holes should be between the top and bottom of the sway braces.
Count the holes carefully, as an incorrect count will cause the upright to be the
wrong depth to hold the shelves.

Unit Depth

Brace Length Distance Between Bolts
12"
30"
18"
30"
24"
30"
30"
30"
4.
Repeat steps 1-4 for the left uprights.
OPEN INDUSTRIAL SHELVING
Starter
27 holes (27
/
")
1
2
24 holes (24
/
")
1
2
19 holes (19
/
")
1
2
10 holes (10
/
")
1
2
Starter & Add On
1
Instructions
Back-To-Back
Assembly

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Starter and is the answer not in the manual?

Questions and answers

Summary of Contents for Global Industrial Starter

  • Page 1 Starter Starter & Add On Back-To-Back Create the right side of the shelving units by laying two uprights side-by-side on a flat surface. Be sure that the short side of the uprights is facing up, as shown in Figure 1.
  • Page 2 You should now have complete left and right sides of your shelving unit, with sway brace bolts and nuts still finger-tightened only. Have an associate hold one upright on it’s side while you bolt the bottom shelf on each post, as shown below.
  • Page 3 For added strength and reinforcement, place "-20 x " bolts and nuts (not included) through each corner of each shelf, and into the small holes of the upright. If more than one unit is to be used in a row, assemble a new unit with "-20 x 1"...
  • Page 4 If two units are to be placed back-to back, the back braces on the first unit become a common pair for the two units. For added shelf strength, insert shelf reinforcement channel 1a. (sold separately) into bottom of shelf. Place on an angle and turn into shelf channels as pictured above.

This manual is also suitable for:

Starter & add onBack-to-back

Table of Contents