Download Print this page

Daikin RXS25HV2C Service Manual page 20

Advertisement

Removal of Four Way Valve
Step
Before working, make
sure that the refrigerant
gas is empty in the circuit.
Be sure to apply nitrogen
replacement when
heating up the brazed
part.
2. Remove the four way
valve.
Heat up the brazed part
1
(a) and withdraw the
piping with pliers.
Heat up the 3 brazed
2
parts of the four way
valve. Disconnect the
point (b) first.
Disconnect the points
3
(c) and (d).
Note:
Do not use a metal saw
for cutting pipes by all
means because the
sawdust comes into the
circuit.
When withdrawing the
pipes, be careful not to
pinch them firmly with
pliers. The pipes may get
deformed.
Provide a protective sheet
or a steel plate so that the
brazing flame cannot
influence peripheries.
18
Procedure
(a)
(b)
Be careful not to get yourself
burnt with the pipes and other
parts that are heated by the
gas brazing machine.
If the refrigerant gas leaks
during work, ventilate the
room. (If the refrigerant gas is
exposed to flames, toxic gas
may be generated.)
(R7418)
From the viewpoint of global
environment protection, do
not discharge the refrigerant
gas in the atmosphere. Make
sure to collect all the
refrigerant gas.
Cautions for restoration
1. Restore the piping by non-
oxidation brazing.
(R7419)
2. It is required to prevent the
carbonization of the oil inside
the four way valve and the
deterioration of the gaskets
affected by heat. (Keep
(d)
below 120°C.) For the sake
of this, wrap the four way
valve with wet cloth and
provide water so that the
cloth does not dry.
In case of difficulty with gas
brazing machine
1. Disconnect the brazed part
where is easy to disconnect
(c)
(R7420)
and restore.
2. Cut pipes on the main unit
with a tube cutter in order to
make it easy to disconnect.
Si00-974
Points
Warning
Warning
Caution
Removal Procedure

Advertisement

loading

This manual is also suitable for:

Rxp25hv2cRxp32hv2cRxp35hv2c