Summary of Contents for Spectrum Swim-Lift Elkhorn MP400
Page 2
You must note the damaged or shortage on the freight carrier’s bill of lading before accepting the shipment. It is Spectrum’s desire to provide you with superior products and services. Unfortunately we cannot control circumstance related to the shipment of products beyond our freight docks. However if you have any questions or problems related to your shipment please feel free to contact us as 800.791.8056 we will...
Page 3
Step 2 Material and Tool Requirements The following materials and tools will be required to complete the assembly and installation: Concrete cutting saw (optional, retrofit anchor installations) Non-expanding concrete 3” diameter concrete core drill (optional, see anchor installation) Epoxy or hydraulic cement (optional, see anchor installation 9/16”...
Page 4
Step 3 Lift Assembly a) Locate each of the lift parts to be assembled and lay them out on the pool deck. b) Attach the hydraulic ram to the lift mast tube on the lower ram attachment tab as shown in figure 3. Use the 1/2"...
Page 5
d) Attach the sling to the sling hanger assembly by slipping each end of the sling chain over one of the hanger end hooks. Hang the sling hanger assembly from the bottom arm as shown in figure 5.
Page 6
Step 4 Anchor Installation If you purchased and installed an Elkhorn anchor previously, please proceed to the Operator’s Guide section for instructions on safely operating your Elkhorn. a) Determine a suitable location for the lift. It is recommended that the lift be installed near the shallow end of the pool in an area with a minimum pool deck to pool floor dimension of 42 inches.
Page 7
Remove the hanger and sling assemblies from the lift boom arm and insert the mast tube into the anchor socket as shown in figure 7. g) Fill the hole in the deck around the anchor with non-expanding concrete. Set the anchor so that the finished top is 1/8”...
Page 8
Operator’s Guide The Swim-Lift®, Elkhorn is designed for a maximum 400 lb load. Do not exceed the maximum rated load at any time. Lift Setup: a) Set the mast tube into the anchor at the bottom of the socket. b) Hook the hanger through the hook eye on the boom arm. c) Attach the sling to the sling hanger assembly by slipping each end of the sling chain over one of the hanger end hooks.
Page 9
If any excessive wear or damaged is observed, do not use the lift. Replacement parts are available from Spectrum Products. b) There are four structural maintenance points that must be inspected each time the lift is used. See figure 9 and the following list for more information on maintenance.
Page 10
Cleaning Spectrum Products uses TP304 stainless steel in the fabrication of its products. All of our products are manufactured using advanced fabrication techniques and our exclusive two-stage passivation process with an electro-polish bath, all of which provide for the optimum corrosive resistant finish.