Energy Management Calibration - Nokia NSE–6 Series Tuning Instructions

Hide thumbs Also See for NSE–6 Series:
Table of Contents

Advertisement

NSE–6
Tuning Instructions

4. Energy Management Calibration

– Select Tuning –> Energy Management Calibration
– Connect the phone to the service junction box and dc cable SCB–3 be-
tween the phone and the service junction box.
– Set the switch of the service junction box to the position FLA–5.
– Connect 10.5V to the service junction box (cable PCS–1) from the
power supply or from the Flash adapter (FLA–5)
– Run calibrations separately or all at once.
– Select calibrations:
Battery & charger default values
––––––––––––––––––––––––––––––––
– Select 1.Run Battery & charger default values
checkbox
Battery voltage
–––––––––––––––
– Select 2.Battery voltage checkbox
Charger voltage
–––––––––––––––
– Select 3.Charger voltage checkbox
Battery size
––––––––––––
– Select 4.Battery size checkbox
Battery temperature
–––––––––––––––––––
– Select 5.Battery temperature checkbox
Charge current
––––––––––––––
– Select 6.Charge current
– Select Save without confirmation, if you don't want
confirm all the selected calibration values before saving
– Run calibrations by pressing Run button
– Set supply voltage back to 8.4 V
Page 12
PAMS
Technical Documentation
Original 08/98

Advertisement

Table of Contents
loading

Table of Contents