Download Print this page

Black & Decker Price Pfister TwistPfit Savannah 49-H Series Manual page 5

Advertisement

Available languages

Available languages

16
16F
16A
16A
16D
16C
16 POP-UP PREPARATION
Remove Flange (16A) from the Drain Body (16B). Remove Locknut (16C),
Friction Washer (16D), Rubber Washer (16E) and Stopper (
(16A).
17
17A
17A
17B
17C
17D
17F
17 POP-UP INSTALLATION
The Flange (17A) can be installed with or without Rubber Seal (17B). If Flange
(17A) is installed without Rubber Seal, apply a small bead of plumber's putty
underneath the Flange (17A) and around Drain Opening (17C). Insert Flange
(17A) into Drain Opening (17C). From underneath, slide Rubber Washer
(17D) and Friction Washer (17E) onto the bottom of Flange (
17E
17E) onto the bottom of Flange (
Locknut (17F) until Rubber Washer (
17F) until Rubber Washer (
17F
(17C). Remove excess plumber's putty. Wrap PTFE plumber's tape to the
bottom external threads of Flange (17A) according to manufacturer's instruc-
tions. Thread Drain Body (17G) to bottom of Flange (17A) and adjust so that
the Ball Rod Opening (17H) faces the rear.
Go To Steps 20
Go To Steps 20
16E
16B
16E) and Stopper (
16F) from Flange
16F) from Flange
16E
16F
17E
17H
17G
17A). Thread
17D) seats securely inside Drain Opening
ENGLISH
18
18 POP-UP PREPARATION
Remove Flange (18A) and Tailpiece (
move Stopper (18D) from Flange (18A).
19
19A
19A
19B
19D
19F
19 ALL METAL POP-UP INSTALLATION
The Flange (19A) can be installed with or without Rubber Seal (19B). If Flange
(19A) is installed without rubber seal, apply a small bead of plumber's putty
underneath the Flange (19A) and around Drain Opening (19C). From under-
neath, insert threaded end of Drain Body (19D) up through Drain Hole (19C).
Hand tighten the Flange (19A) onto the Drain Body (19D) from the top of the
sink. From underneath, adjust the Drain Body (19D) so that the Ball Rod
Opening (19E) faces the rear. Thread Locknut
19E) faces the rear. Thread Locknut
19E
until Rubber Washer (19G) seats securely inside Drain Opening (19C). Re-
move excess plumber's putty. Wrap PTFE plumber's tape to the top external
threads of Tailpiece (19H) according to manufacturer's instructions. Thread
Tailpiece (19H) to bottom of Drain Body (19D).
5
18A
18A
18C
18B
) from the Drain Body (18C). Re-
19C
19G
19E
19H
(19F) from underside of sink
(19F) from underside of sink
(19F
18D

Advertisement

loading