Download Print this page

Kettler 7399-600 Manual page 10

Outdoor foosball table

Advertisement

Step 4
Rod Bushing Assembly
8 required
16 required
M4 X 25
Insert the 2 part inner
bushing in the open
cabinet hole (which has
the rod extending
through) as shown. (A, B)
Install the outer bushing with
pins on the outside of
cabinet, lining it up with pins
from inner bushing. (D)
Ensure that it is flush with
the outside of the cabinet
wall. (E)
May be necessary to complete before proceeding with Step 4
8 required
Ensure that it is flush with
the inside of the cabinet wall.
(C)
9

Advertisement

loading