Tidel TACC-IIa Installation And Startup

Tidel TACC-IIa Installation And Startup

Hide thumbs Also See for TACC-IIa:

Advertisement

TACC-IIa
Installation and Start-up

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the TACC-IIa and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for Tidel TACC-IIa

  • Page 1 TACC-IIa Installation and Start-up...
  • Page 2 Tidel equipment to the fl oor. When the Tidel equipment is secured to this type of fl oor, with the above mentioned anchors, bolts and washers, it will require at least 6,000 pounds of vertical pressure or 8,420 pounds of horizontal pressure, per anchor, to forcibly remove the unit.
  • Page 3 Unpacking When unpacking or installing a TACC-IIa, note the following: After packing material has been removed from the TACC unit, the keys will be found tie- wrapped to the frame, below the Control Panel. 2 – Door bolt keys. 4 – Manager keys.
  • Page 4 If the Door Bolt Key operates (Door Locking Bolt restracts), the door  Solenoid is operating properly. Proceed to step 5. If the Door Bolt Key does not operate, refer to the TACC-IIa Trouble-  shooting Guide. Step 5: Check the vending operations: a) Place a “Vend Tube”...

Table of Contents