Torque Chart; Pre-Delivery Check List - Buhler Allied 595 Assembly, Operator's And Parts Manual

Buhler front-load washer operator's and parts manual
Hide thumbs Also See for Allied 595:
Table of Contents

Advertisement

Pre-delivery Check List

Before delivering this equipment please complete the following check list.
1. The loader has been installed using the appropriate mounting kit for the tractor and loader.
2. The hydraulic system installed is appropriate for the tractor and loader
3. The loader is properly installed.
4. All bolts are tightened to the torque specifications shown in the torque chart.
5. All safety decals are readable.
6. The loader has been tested and operates properly.
7. The operator's manual has been delivered to the owner who has been instructed on the safe and proper use
of the loader.
Dealer's Signature_________________________________________________
This check list is to remain in this Owner's Manual and is the responsibility of the dealer to complete it before
delivery to the customer.
3

Advertisement

Table of Contents
loading

This manual is also suitable for:

Allied 595sAllied 595tslAllied s595tsl

Table of Contents