Operation - Glacier bay HD67553-014405 Installation And Care Manual

Pull-down kitchen faucet
Hide thumbs Also See for HD67553-014405:
Table of Contents

Advertisement

Available languages

Available languages

Installation (continued)
4
Making the water supply
connections
NOTE: The hot side inlet tube is indicated by a label. Avoid
twisting wires together or placing the wires close to each
other and damaging.
Thread the nut (1) on the supply line onto the
outlet of the water supply valve (2) and tighten
with a wrench. Do not overtighten.

Operation

1
Flushing and checking for leaks
IMPORTANT: After installation is completed, turn on the
hot and cold water supplies. Check for leaks. Do not lose
the gasket (1) in the hose.
Pull the hose assembly out of the spout and
remove the spray head by unscrewing it from
the hose in a counterclockwise direction. Be
sure to hold the end of the hose down into the
sink and turn the faucet to the warm position
where it mixes hot and cold water.
Flush the water lines for one minute. This ushes
away any debris that could cause damage to
internal parts. Check for leaks.
Re-tighten any connections if necessary, but do
not overtighten. Reinstall the spray head by hand
tightening it back onto the spray hose in a
clockwise direction.
1
2
1
6

Hide quick links:

Advertisement

Chapters

Table of Contents
loading

This manual is also suitable for:

3057648661003341110

Table of Contents