Download Print this page

Reynolds Building Systems Best Barns Meadowbrook-R Assembly Book page 18

12' x 10'

Advertisement

Step 14
Install Roof Sheathing
Install roof sheathing on the steep side of the roof. Use a straight edge to align the top of the
sheathing with the top of the truss. See Detail 'B'. Make sure the trusses are plumb and the roof
sheathing meets the center of the truss. Use 7d sinkers spaced 12" apart.
Install first sheet flush with back gable trim. Work back to front. The top roof sheathing will not
extend to the ridge. This will allow an opening for air ventilation when you install a ridge vent.
46" x 72"
42" x 72"
Install Shingles - not included in kit
1. Install felt paper and metal roof edge the permitter of the building.
2. Install shingles according to the instructions on the wrapper. If you need more detailed
instructions on installing shingles, there are good publications at book stores or newsstands.
Building Tip: Install ridge vent in lieu of shingles caps. Ridge
vent provides ideal ventilation, preventing heat or moisture from
damaging your building or its contents.
Material Description
Roof Shingles
Roof 'drip' Edge
46" x 80"
42" x 80"
Remove From
Shipping Pallet
Building Length
10'x16'
10'x12'
7 bdl.
10 bdl.
6 pcs.
7 pcs.
Cut 80" long roof sheathing flush
with face of the gable trim
Shingles
Air
Space
Ridge vent provides
ideal ventilation.
Detail 'B'

Advertisement

loading
Need help?

Need help?

Do you have a question about the Best Barns Meadowbrook-R and is the answer not in the manual?

Subscribe to Our Youtube Channel