Page 1
9.00 a.m. - 6.00 p.m. EST, Saturday 1-855-HD-HAMPTON HAMPTONBAY.COM THANK YOU pergola. to continually create quality products designed to enhance your home. Visit us online to see our full line of products available for your home improvement needs. Thank you for choosing Hampton Bay!
Table of Contents Table of Contents ............2 Pre-Assembly ............3 Safety Information ............2 Planning Assembly..............3 Care Instructions ..............2 Part List..................3 Assembly ...............4 Safety Information WARNING: Keep all flames and heat sources away from the sling roof panels. These parts are not fire proof and will burn or melt if left in continuous contact with any extreme heat source.
Pre-Assembly PLANNING ASSEMBLY It will take at least three people about 30 minutes to complete the assembly process. A Philips screwdriver, a rubber mallet and a free standing ladder are needed during the assembly process. PART LIST Part Description Quantity Part Description Quantity...
Pre-Assembly NOTE: Hardware not shown to actual size. Part Description Quantity Bolt (M6x20) Bolt (M6x35) Bolt (M6x70) Washer(Ф8.8x1.0) Bolt cap (Ф16x5) Hex wrench Ground stake (Ф4x137) Assembly Attaching post bases A x 2 B x 2 Attach one post base (M) to the bottom of each corner post (A)/(B) with washers (DD) and bolts (AA) using hex wrench (FF). Do not cover bolt caps in each step until at the end of step 10 when all bolt are firmly secured.
Page 5
Assembly Attaching cross beam (D) Attach the top of one corner post (B) to each end of cross beam (D) with washers (DD) and bolts (AA) using hex wrench (FF). Attaching cross bar (F) DD AA Attach cross bar (F) to the lower portion of both corner posts (B) with washers (DD) and bolts (AA) using hex wrench (EE).
Page 6
Assembly Installing slat panels Attach slat (I) onto the three supports tubes (H) with washers (DD) and bolts (AA) using hex wrench (FF). y l l g i t s t l t l i Attaching the slat panel Inset the slat panel from step 4 into the frame from step 3. Secure support bars (H) onto the cross beam (D) with washers (DD) and bolts (CC) using hex wrench (FF).
Page 7
Assembly Erecting the frame Insert Place the corner posts (B) upright. With a ladder attach roof rails (E) to corner posts (B) at the top with washers (DD) and bolts (AA) using hex wrench (FF). Insert the top of corner post (A) into cross beam (C). Place the corner posts (A) upright.
Page 8
Assembly Attaching roof rail (G) Attach the roof rail (G) to cross beam (C) and (D) with washers (DD) and bolts (AA) using hex wrench (FF).
Page 9
Assembly Assembling roof panels Insert roof panel tubes (K) into sling (N) in the direction of depth. Insert roof panel tubes (J) into sling (N) in the direction of width. Secure tubes (J) and tubes (K) at four corners with washers (DD) and bolts (BB) using hex wrench (FF). Plug roof panel tube (L) into roof tubes (K) in the center.
Page 10
Assembly Installing roof panels Slide two roof panels into the upper roof rails . Slide the other roof panels into the lower roof rails.
Page 11
Assembly Fixing the Cross Beam (C) and Anchoring the Pergola Pull out Move roof panels [L] Remove the temporary bolts from cross beam (C). Minimize the gaps between cross beam (C) and roof rails (E). Secure cross beam (C) and corner posts (A) with washers (DD) and bolts (AA) using hex wrench (FF).
Page 12
Questions, problems, missing parts? Before returning to the store, call Hampton Bay Customer Service 8.00 a.m. - 7.00 p.m. EST, Monday - Friday, 9.00 a.m. - 6.00 p.m. EST, Saturday 1-855-HD-HAMPTON HAMPTONBAY.COM Retain this manual for future use.
Need help?
Do you have a question about the 5RGZ1389-WBS and is the answer not in the manual?
Questions and answers