2.0 INTRODUCTION
The LP2 ceiling void mounted unit is designed to provide mechanical
supply and extract ventilation with heat recovery and incorporates HX
bypass.
The unit is fitted with two independent fans. Each fan has full speed
control for background and boost ventilation rates. To recover heat
from the extract air the heat exchanger block is utilised. The heat
exchanger can recover up to 80% of the normally wasted heat.
The unit must remain switched on at all times to maintain
ventilation within the dwelling. Turning the unit off will cause long
term damage to the unit and building fabric.
This appliance is not intended for use by persons (including
children) with reduced physical, sensory or mental capabilities,
or lack of experience and knowledge, unless they have been given
supervision or instruction concerning the use of the appliance by a
person for their safety. Children should be supervised so that they
do not play with the appliance.
1
Unit Airflow Paths (Standard Unit Configuration)
Spigot 3.
Spigot 2.
Spigots 1 to 4
1. Intake Air (Fresh air from outside).
2. Supply Air (Supply in to house).
3. Extract Air (Warm stale air from house).
4. Exhaust Air (Waste air to oustide).
2
Unit Airflow Paths (Opposite Hand Unit Configuration)
Spigot 1.
Spigot 4.
Spigots 1 to 4
1. Intake Air (Fresh air from outside).
2. Supply Air (Supply in to house).
3. Extract Air (Warm stale air from house).
4. Exhaust Air (Waste air to oustide).

3.0 MECHANICAL INSTALLATION

Installation must be carried out by competent personnel in accordance
with the appropriate authority and conforming to all statutory
governing regulations. All mains wiring must be in accordance with the
current I.E.E. Regulations, or the appropriate standards. Ensure that the
mains supply (Voltage, Frequency and Phase) complies with the rating
label.
Please note a clear working space is required around the installed unit
to allow the cover to be removed and provide sufficient access for
maintenance such as filter change.
Nuaire |
Western Industrial Estate
Spigot 1.
Spigot 4.
Spigot 3.
Spigot 2.
|
|
| nuaire.co.uk
Caerphilly
CF83 1NA
The fan must be installed indoors, in a suitable ceiling void away from
direct sources of frost, heat, water spray or moisture generation. For a
vibration-free result the unit must be mounted to a solid surface in the
void.
The unit is designed for ceiling mounting only (Horizontal surface).
The unit is supplied with a steel mounting bracket.
Position & secure the steel bracket to the ceiling using appropriate
fixings (supplied by others), ensuring that the two outer fixing holes on
the unit are accessible (Figure 3).
The mounting bracket should be on the same side as the
condensate take off.
3. The unit can now be offered into position & located into the
mounting bracket.
4. Using appropriate fixings (supplied by others) fix the unit to the
ceiling. It is recommended that the unit is fixed through three holes on
the non-bracket side and the two outer holes on the bracket side.
The unit must be installed in an upright position as shown for
the condensate drain and for compliance with safety regulations
relating to IP protection for water drip ingress.
3
Standard Unit Mounting Using Appropriate Fixing Bolts
Steel mounting bracket
4
Side View Of Standard Unit Typical Ceiling Void Installation
Using 204 x 60 mm Rectangular Ducting & Air Valves
204 x 60mm
ducting in
ceiling void.
Air valve
in ceiling.
3.1 Condensate Drain Installation
•Unit comes complete with external drain pipe (21.5mm waste
pipe). Use conventional plumbing connections to link up with
U-trap or alternative drain method (Solvent cement connections
or compression fit connections are recommended). The
condensate must be discharged under a water level in a U-trap
drainpipe or an alternative drain method which acts as an airlock.
•This condensate discharge connection is suitable for 21.5mm dia.
overflow pipe. Solvent cement should be used to make the joint.
•If using a U-trap please ensure the U-trap has been filled to a
suitable level of water to avoid any air locks.
•If the condensation pipe is fitted in an unheated space the pipe
should be in insulated to prevent freezing.
Nuaire recommend MVHR-DRAIN be used as the primary condensate
take-off (Figure 5 and 6).
07. 01. 21. Document Number 671875
MRXBOXAB-ECO-LP2
Side view of unit
mounted in the ceiling void.
2

Advertisement

Table of Contents
loading

This manual is also suitable for:

Mrxboxab-eco-lp2-oh

Table of Contents