Recommended maintenance and
monitoring programme
Baltimore Aircoil Company equipment needs to be properly installed, operated and maintained. Documentation of
the equipment used, including a drawing, technical data sheet and this manual should be kept on record. To
achieve long, trouble-free and safe operation, it is necessary to establish an operating plan including a programme
of regular inspection, monitoring and maintenance. All inspections, maintenance and monitoring actions should be
recorded in a cooling system logbook. The operating and maintenance instructions published here can be used as
a guide to achieve these goals.
In addition to establishing the operating plan and the cooling system logbook it is recommended to conduct a
cooling system risk analysis, preferably by an independent third party.
For the cooling system, scale, corrosion and biological control must be established and initiated when the system
is first filled with water and administered on a regular basis thereafter in accordance with recognized Codes of
Practice, (such as EUROVENT 9 - 5/6, ACOP HSC L8, Guide des bonnes pratiques, Legionella et tours
aéroréfrigérantes, etc.). Water sampling, test results and corrective actions should be recorded in the cooling
system logbook.
For more specific recommendations on keeping your cooling system efficient and safe, contact your local BAC
Balticare service provider or representative. Name, e-mail and phone number can be found on the website
www.BACService.eu.
Checks and adjustments
Cold water basin & strainer
Operating level and make-up
Blow down
Sump heater package
Belt tension
Drive alignment
Locking collar
Rotation of fan(s) and pump(s)
Motor voltage and current
Unusual noise and/or vibration
Inspections and monitoring
General condition
Heat transfer section
Drift eliminators
Water distribution
Fan shaft
Fan motor
Electric water level control package (optional)
TAB test (dip slides)
Circulating water quality
System overview
Record keeping
2
W W W . B A L T I M O R E A I R C O I L . E U
Start-Up
Weekly
Monthly
X
X
X
X
X
X
X
X
X
X
X
X
X
X
Start-Up
Weekly
Monthly
X
X
X
X
X
X
X
X
X
X
X
X
X
Quarterly
Every 6
Annually
months
X
X
X
Quarterly
Every 6
Annually
months
X
X
X
X
X
X
as per event
Shutdown
X
X
Shutdown
X