Page 2
Venezia INSTALLATION GUIDE Wall-Faced Bath INSTALLATION Installation must be carried out by a licensed plumber in compliance with the Plumbing Code of Australia.. Check local and national building regulations before installation to ensure the below methods comply with the relevant codes. Tools required for installation: Silicone Gun, Spirit Level, Tape Measure, Pencil, Adjustable Spanner.
Page 3
Venezia INSTALLATION and CARE GUIDE Wall-Faced Bath Figure 4 Plug & Waste Flexible Connector 600 max 40mm pop-down Waste Pipe waste with 600mm flexible connector Waste Trap PW8 or PW8B Figure 5 Your Venezia Wall-Faced Bath is manufactured using Lucite sanitary grade acrylic.
Page 4
1300 746 480 bpa.warranty@johnsonsuisse.com.au Visit www.johnsonsuisse.com.au to view full warranty terms. Our goods come with guarantees that cannot be excluded under the Australian Consumer Law. You are entitled to a replacement or refund for the major failure and for compensation for any other reasonably foreseeable loss or damage.
Need help?
Do you have a question about the Venezia JBTV3166 and is the answer not in the manual?
Questions and answers