Black Box LB9024A Installation

Black Box LB9024A Installation

Express plus ethernet switches
Hide thumbs Also See for LB9024A:

Advertisement

Installation
Installation
Installation
Installation
This installation guide gives step-by-step instructions about how to install the Express Plus Ethernet Switch: LB9024A

Selecting a Site for the Express Plus Ethernet Switch: LB9024A

As with any electric device, you should place the switch where it will not be subjected to extreme temperatures, humidity,
or electromagnetic interference. Specifically, the site you select should meet the following requirements:
-
The ambient temperature should be between 32 and 104 degrees Fahrenheit (0 to 40 degrees Celsius).
-
The relative humidity should be less than 90 percent, non-condensing.
-
Surrounding electrical devices should not exceed the electromagnetic field (RFC) standards for IEC
801-3, Level 2 (3V/M) field strength.
-
Make sure that the switch receives adequate ventilation. Do not block the ventilation holes on each side of
the switch or the fan exhaust port on the rear of the switch.
-
The power outlet should be within 1.8 meters of the switch.

Connecting to Power

Internal power:
Step 1:
Connect the supplied AC power cord to the receptacle on the back of the switch, and then plug it into a standard AC outlet with a
voltage range from 100 to 260 Vac.
Step 2:
Turn on the switch by flipping the ON/OFF switch on the rear of the unit to I (ON) position.
Step 3:
The O position is OFF.
Figure 1: Rear view
CUSTOMER
SUPPORT
INFORMATION
Order toll-free in the U.S. 24 hours, 7 A.M. Monday to midnight Friday: 877-877-BBOX
FREE technical support, 24 hours a day, 7 days a week: Call 724-746-5500 or fax 724-
746-0746
Mail order: Black Box Corporation, 1000 Park Drive, Lawrence, PA 15055-1018
Web site: www.blackbox.com • E-mail: info@blackbox.com

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the LB9024A and is the answer not in the manual?

Questions and answers

Summary of Contents for Black Box LB9024A

  • Page 1 Installation Installation This installation guide gives step-by-step instructions about how to install the Express Plus Ethernet Switch: LB9024A Selecting a Site for the Express Plus Ethernet Switch: LB9024A As with any electric device, you should place the switch where it will not be subjected to extreme temperatures, humidity, or electromagnetic interference.
  • Page 2 Order toll-free in the U.S. 24 hours, 7 A.M. Monday to midnight Friday: 877-877-BBOX CUSTOMER FREE technical support, 24 hours a day, 7 days a week: Call 724-746-5500 or fax 724- SUPPORT 746-0746 INFORMATION Mail order: Black Box Corporation, 1000 Park Drive, Lawrence, PA 15055-1018 Web site: www.blackbox.com • E-mail: info@blackbox.com...

Table of Contents