Samsung VMR-O P3.9 Product Manual page 19

Table of Contents

Advertisement

1. Select the installation area of the VMR-O HD display and enclose it with a safety
warning band. Non-workers are not allowed to enter without permission, keeping the
installation area clean, free from dirt and debris.
2. Ensure that you have read, understood and followed all of the safety issues
mentioned in Chapter 1 before installation;
3. Make sure that the installed LED cabinets, accessories, tools and other materials
are ready in place.
6.1.2 Folding bracket installation instruction
Step 1: Install the base beam. The base beam is the first layer of a screen to ensure
flatness. The base beam can be spliced into the length as requeste by installation
requirements, as shown in Picture 6-1.
Picture 6-1 Stacking Base Beam
Step 2: Install the standing base bar. Align the base bar with the base beam as show
below Picture 6-2.
Picture 6-2 Standing Base Bar
Step 3: Install the bracket. Assemble the bracket to the base as shown below, as
shown in Picture 6-3.
19 / 66

Advertisement

Table of Contents
loading

Table of Contents