Download Print this page
ETI Snow Switch GF Pro Quick Reference Installation Manual

ETI Snow Switch GF Pro Quick Reference Installation Manual

Automatic snow/ice melting system control panel

Advertisement

Quick Links

PACKING LIST
QTY.
PART NO.
DESCRIPTION
1
23917
GF Pro
1
23731
Accessory Kit
1
24454
GF Pro Installation Sheet (this document)
-
23918
SNOW SWITCH MODEL GF PRO Installation & Operation Manual
Available online at:
The Snow Switch Model GF Pro Automatic Snow and Ice Melting System is permanently connected equipment
and does not have an internal disconnect device. A readily accessible disconnect device, short circuit, and current
NOTE:
protection shall be provided and are not supplied by ETI When power is applied, the system will start.
CONNECTIONS
1. Even when the heat tapes are disconnected, as long
as the circuit breaker is on and power is running to
the unit, voltage is still being applied to the yellow
heat tape leads. Therefore, never touch the ends of
the yellow leads or let the two leads touch each other.
Do not let the two yellow heat tape leads contact any
component inside the unit.
2. Any installation involving electric heater wiring must
be grounded to earth to protect against shock and
fire hazard. Suitable ground fault detection and
interrupting systems must be in use at all times to
reduce shock and fire hazard and to protect personnel
and equipment.
South Bend, Indiana USA
|
networketi.com
AUTOMATIC SNOW/ICE MELTING SYSTEM CONTROL PANEL
networketi.com/product-manuals
MODEL GF PRO
3. Electric wiring to heating elements must be installed
in accordance with National Electrical Code (NEC)
requirements, as well as other local and applicable
electrical codes and third party standards.
4. Only UL listed, 4X, raintight conduit hubs and cable
glands are to be used. The hub is to be connected to
the conduit of a rigid conduit system before the hub
is connected to the enclosure.
5. Ensure a sealed, watertight installation. Waterproof all
cable runs, seal all box joints, and properly terminate
wiring.
6. Shut off system circuit breaker prior to beginning
installation.
SNOW/ICE CONTROL INSTALLATION GUIDE | PART NO.
24454
REV
D

Advertisement

loading
Need help?

Need help?

Do you have a question about the Snow Switch GF Pro and is the answer not in the manual?

Questions and answers

Summary of Contents for ETI Snow Switch GF Pro

  • Page 1 A readily accessible disconnect device, short circuit, and current NOTE: protection shall be provided and are not supplied by ETI When power is applied, the system will start. CONNECTIONS 3. Electric wiring to heating elements must be installed in accordance with National Electrical Code (NEC) 1.
  • Page 2 Power Cable Size for 30 Amp (provided by customer) maximum load Sensor Wiring #18 AWG jacketed, TO HEATER CABLE 3-conductor Heater Load Line 1 / Yellow Heater Load Line 2 / Yellow Heater Ground (sheild) / Green Heater Cable Size to system load (provided by customer) Remote Wiring #22 AWG jacketed,...
  • Page 3 SAFETY & WARNINGS 1. Even when the heat tapes are disconnected, as long 4. It is recommended to read these installation instruc- as the circuit breaker is on and power is running to tions prior to beginning installation. the unit, voltage is still being applied to the yellow heat tape leads.
  • Page 4 ETI to notify 8. As directed on page 17 of the GF Pro Instruction any person or organization of such revisions, changes or Manual, perform Post-Installation Testing as described, improvements.