OmniMetrix TrueGuard-PRO Basler DGC2020 Installation Manual

Advertisement

Quick Links

1. Unpack the monitor, antenna and the data/power cable. The
25 pin connector plugs onto the front of the OmniMetrix
monitor. This cable includes wires to power the monitor as
well as wires for alarm inputs, relay outputs and analog inputs.
Take a moment to inspect all components to verify there is no
shipping damage.
2. Place the antenna vertically on the roof of the generator and
route the antenna cable into the area of the generator control.
The antenna used for transmitting must be installed to provide
a separation distance of at least 20 cm from all persons and
must not transmit simultaneously with any other antenna
transmitters. BE SURE to provide a drip loop lower than the
monitor to keep water from running down the antenna cable
into the monitor connection.
3. Attach the monitor via its magnetic feet, on top of the engine
controller or other appropriate location. Horizontal surfaces
are best, but the unit may be mounted vertically or even
upside down if necessary. Note: If mounted vertically, install
the monitor with the cables down to prevent water from
entering the enclosure.
4. Route the data/power cable into the generator control
enclosure.
5. The Monitor wires to the Basler Terminal aboard using the
wiring definitions displayed in Table 1 (Page 2). Also, please
refer to the diagram on page 3 for added assistance.
6. Attach the antenna cable to the front of the monitor and
tighten thumb tight.
7. Turn on the monitor and confirm that the LEDs light up and
blink. If not, check for power on the terminal strip. If, after 5
minutes, the only LED lit is the Power LED, check the
antenna mount and cable connection.
8. Allow 15 minutes for the monitor to log into the network and
then call OmniMetrix at 770-209-0012 to confirm installation.
Access to machine data is through the OmniView
interface at www.omnimetrix.net. Contact OmniMetrix for
login instructions and web training.
TrueGuard-PRO
®
web
4295 Hamilton Mill Road, Suite 100 ▪ Buford, GA 30518
www.omnimetrix.net ▪ 770-209-0012
Basler DGC2020 Hardwire
®
Data/Power Cable
DGC2020 Control Panel
Hardwire Terminal Connection
Installation Guide
IM-759 Rev. B
25-MAR-2019

Advertisement

loading

Summary of Contents for OmniMetrix TrueGuard-PRO Basler DGC2020

  • Page 1 1. Unpack the monitor, antenna and the data/power cable. The ® 25 pin connector plugs onto the front of the OmniMetrix monitor. This cable includes wires to power the monitor as well as wires for alarm inputs, relay outputs and analog inputs.
  • Page 2 Not in Auto Yellow Brown Table 1 NOTE: If 2-wire remote start is desired, use OmniMetrix White/Yellow and White/Brown wires across the 2-wire start terminals. If you have any questions, please call OmniMetrix Tech Support at 770-209-0012 or email at techsupport@omnimetrix.net.
  • Page 3 4295 Hamilton Mill Road, Suite 100 ▪ Buford, GA 30518 www.omnimetrix.net ▪ 770-209-0012 IM-759 Rev. B 25-MAR-2019...