1 LEDs: Locator, Service, Power
4 Two USB 2.0 ports
7 Alert indicators
Back Panel Components
1 Power Supply Unit (PSU) 1
4 NET MGT port
7 Four 10 Gb Ethernet ports
10 Cluster interface card (slot 4)
Install the Hardware
For detailed information, see the Oracle ZFS Storage Appliance Installation Guide available from
oracle.com/en/storage.
2 System disk 1
5 RFID tag
2 Second PCle option (slot 1)
5 First PCle option (slot 5)
8 SER MGT port
11 First 4x4 SAS HBA (slot 2)
3 Permanent HDD filler panels
6 System disk 0
3 Third PCle option (slot 3)
6 Second 4x4 SAS HBA, or fourth PCle
option (slot 6)
9 Two USB 3.0 ports
12 Power Supply Unit (PSU) 0
http://docs.
2
Need help?
Do you have a question about the ZFS Storage ZS5-2 and is the answer not in the manual?
Questions and answers