Back Panel Components; Install The Hardware - Oracle ZFS Storage ZS5-2 Getting Started Manual

Hide thumbs Also See for ZFS Storage ZS5-2:
Table of Contents

Advertisement

1 LEDs: Locator, Service, Power
4 Two USB 2.0 ports
7 Alert indicators

Back Panel Components

1 Power Supply Unit (PSU) 1
4 NET MGT port
7 Four 10 Gb Ethernet ports
10 Cluster interface card (slot 4)

Install the Hardware

For detailed information, see the Oracle ZFS Storage Appliance Installation Guide available from
oracle.com/en/storage.
2 System disk 1
5 RFID tag
2 Second PCle option (slot 1)
5 First PCle option (slot 5)
8 SER MGT port
11 First 4x4 SAS HBA (slot 2)
3 Permanent HDD filler panels
6 System disk 0
3 Third PCle option (slot 3)
6 Second 4x4 SAS HBA, or fourth PCle
option (slot 6)
9 Two USB 3.0 ports
12 Power Supply Unit (PSU) 0
http://docs.
2

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the ZFS Storage ZS5-2 and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

This manual is also suitable for:

Zs5-2

Table of Contents