Important Do's And Dont's - gledhill Torrent GreenHeat TGH140-OV Design, Installation & Servicing Instructions

Torrent greenheat series
Hide thumbs Also See for Torrent GreenHeat TGH140-OV:
Table of Contents

Advertisement

DO -
Check the incoming mains water pressure. If it exceeds 5.0 bar at any point
in the 24 hour cycle then a pressure limiting valve set at 3.0 bar should be
fi tted where the cold supply enters the property.
DO -
Check the fl ow rate of the incoming cold water main is adequate to meet
the maximum hot and cold water simultaneous demands.
DO -
Check that all connections are in accordance with the labelling on the
thermal store.
DO -
Fill the tank manually or adjust the ballvalve so that the water in the F & E
tank is set to the correct level.
DO -
Restrict the ballvalve fi ll rate when full so that the overfl ow pipe can cope
with the fi ll rate in the event of a ballvalve failure.
DO -
Make sure there is adequate clearance above the F & E tank to service the
valve.
DO -
Ensure that range-rated appliances are set to the specifi ed design heat
input and the boiler thermostat is set to maximum for all boilers.
DO -
Ensure that the water level in the expansion tank is at least 250mm above the
highest point on the radiator circuit and satisfi es the boiler head required.
DO -
Insulate any exposed pipework in the Torrent cupboard.
DO -
Plumb the overfl ow warning pipe in 20mm minimum internal diameter
tubing to discharge in a conspicuous external position, using high
temperature uPVC or copper.
DO -
Check the pump setting. This should be set as high as possible (consistent
with not creating noise) so as to give a small temperature difference across
the boiler, i.e. not greater than 11°C.
DO -
Leave the electricity switched on to the appliance once it has been fi lled
and commissioned to prevent the pump sticking.
DON'T - Use a combined feed and vent on Torrent indirect installations.
DON'T - Use tube smaller than 28mm between boiler and Torrent when the boiler
exceeds 60,000 Btu (17kW) output.
DON'T - Use dipped fl ow and return pipes between boiler and Torrent unless the
boiler is fi tted with an overheat switch, then follow the recommendations
on page 15.
DON'T - place any clothing or other combustible materials against or on top of this
appliance.
INSTALLATION

IMPORTANT DO'S AND DONT'S

Page 39

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents