Columns Assemble Work Surface Support Frame Attach Work Surface to Support Frame Replace Cross Rail Cover and Trim Attach Control Panel Leveling & Calibrating Desk eisys, inc. 112 28th Street South • Birmingham, Alabama 35233 • 205.941.1942 • www.eisys-inc.com...
DESKING eisys Work Surface Support Frame Gas Cylinder Support Frame Spanners Cross Rail Cover Gas Cylinder Cross Rail Foot pic.1 eisys, inc. 112 28th Street South • Birmingham, Alabama 35233 • 205.941.1942 • www.eisys-inc.com...
Wood Screws—12 ea. Socket Cap Bolts —4 ea. M5 x 25 #4 x 16 Flat Head Screws —8 ea. Wood Screws —3 ea. 4” Zip Ties—3ea. eisys, inc. 112 28th Street South • Birmingham, Alabama 35233 • 205.941.1942 • www.eisys-inc.com...
Assembling Cross Rail to Columns (Legs) Use the 8mm nut driver or socket to remove cross rail cover at indicated positions. (pic.2-3 ) pic.2 cross rail as seen from below pic.3 eisys, inc. 112 28th Street South • Birmingham, Alabama 35233 • 205.941.1942 • www.eisys-inc.com...
Page 7
CRITICAL!!! Make sure the gears in both columns (legs) are aligned at the exact same position in each gear track per above *TIP and picture 7. pic.8 eisys, inc. 112 28th Street South • Birmingham, Alabama 35233 • 205.941.1942 • www.eisys-inc.com...
The force of the cylinders without the weight of the top could damage the desk mechanism. eisys, inc. 112 28th Street South • Birmingham, Alabama 35233 • 205.941.1942 • www.eisys-inc.com...
Top MUST fit flush on work surface support frame. If accurate proceed to Step 5. pic.13 Generic Drilling Diagram (your diagram may be different) eisys, inc. 112 28th Street South • Birmingham, Alabama 35233 • 205.941.1942 • www.eisys-inc.com...
Use wood screws to secure the rest of the pic.15 frame to the top. (pic.17) pic.16 pic.17 eisys, inc. 112 28th Street South • Birmingham, Alabama 35233 • 205.941.1942 • www.eisys-inc.com...
Align cover on top of cross rail Screw cover to cross rail using the pic.18 8-8mm hex nuts removed in Step 2. (pic.20) pic.19 pic.20 cross rail as seen from below pic.21 eisys, inc. 112 28th Street South • Birmingham, Alabama 35233 • 205.941.1942 • www.eisys-inc.com...
If Desk is integrated into a lowboard/pedestal jump to Section 2/page 15, install lowboard- pic.23 pedestal before moving to Step 8. fix cable here pic.24 M1 Control Panel M2 Control Panel eisys, inc. 112 28th Street South • Birmingham, Alabama 35233 • 205.941.1942 • www.eisys-inc.com...
IMMEDIATELY, refer to Section 5 (M2 only-Continue pressing the and call eisys at once. down arrow until the LED stops flashing and reads “68”). 4. The desk is now ready for use. eisys, inc. 112 28th Street South • Birmingham, Alabama 35233 • 205.941.1942 • www.eisys-inc.com...
DESKING eisys Section 2: Attaching the Desk to the Lowboard/Pedestal eisys, inc. 112 28th Street South • Birmingham, Alabama 35233 • 205.941.1942 • www.eisys-inc.com...
(pic.26 & 27) pic.26 From inside the lowboard/pedestal bolt the cross rail to the top of the lowboard- pedestal. (pic 28 & 29) pic.27 pic.28 pic.29 eisys, inc. 112 28th Street South • Birmingham, Alabama 35233 • 205.941.1942 • www.eisys-inc.com...
Page 16
90º angle prior to fastening. Raise Desk to highest position. Allow length of Cable Chain to enter lowboard/pedestal 2”. Remove any excess Cable Chain from interior of cabinet. pic.31 pic.32 eisys, inc. 112 28th Street South • Birmingham, Alabama 35233 • 205.941.1942 • www.eisys-inc.com...
DESKING eisys Section 3: Accessories eisys, inc. 112 28th Street South • Birmingham, Alabama 35233 • 205.941.1942 • www.eisys-inc.com...
Page 18
If not factory installed, install using templates and instructions provided. Cable Tray See instructions included in the Accessory Box Desk Top Privacy Panel See instructions included in the Accessory Box CPU Holder eisys, inc. 112 28th Street South • Birmingham, Alabama 35233 • 205.941.1942 • www.eisys-inc.com...
DESKING eisys Section 4: Care and Maintenance FAQ & Troubleshooting eisys, inc. 112 28th Street South • Birmingham, Alabama 35233 • 205.941.1942 • www.eisys-inc.com...
Page 20
Only apply lubricant to “moving” parts within the cross rail. Excess lubricant on exposed surfaces of the desk should be cleaned with warm soapy water and a soft cloth. eisys, inc. 112 28th Street South • Birmingham, Alabama 35233 • 205.941.1942 • www.eisys-inc.com...
0-165 lbs (0-75 kg) movable *load option-ZM (M1/M2) min 88 lbs (40kg)-max 253 lbs (115 kg) *load = additional weight equally distributed on the desk top. eisys, inc. 112 28th Street South • Birmingham, Alabama 35233 • 205.941.1942 • www.eisys-inc.com...
Page 22
Max. additional load Reduce weight exceeded shortly and stops Desk is moving downwards Min. additional load Put min. weight bearing on desk top undershoot shortly and stops eisys, inc. 112 28th Street South • Birmingham, Alabama 35233 • 205.941.1942 • www.eisys-inc.com...
Page 23
There might be an overload: Overcurrent on M2 up-remove excess weight on desk top down-remove excess weight on desk top Overcurrent on control Overcurrent on motor group eisys, inc. 112 28th Street South • Birmingham, Alabama 35233 • 205.941.1942 • www.eisys-inc.com...
Need help?
Do you have a question about the iMove-F and is the answer not in the manual?
Questions and answers