Eisys iMove-C Assembly Manual

Pneumatic version-h1/h2

Advertisement

Quick Links

DESKING
eisys
iMove-C Assembly Manual
(Pneumatic Version-H1/H2)
eisys, inc.
112 28th Street South • Birmingham, Alabama 35233 • 205.941.1942 • www.eisys-inc.com

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the iMove-C and is the answer not in the manual?

Questions and answers

Summary of Contents for Eisys iMove-C

  • Page 1 DESKING eisys iMove-C Assembly Manual (Pneumatic Version-H1/H2) eisys, inc. 112 28th Street South • Birmingham, Alabama 35233 • 205.941.1942 • www.eisys-inc.com...
  • Page 2: Table Of Contents

    Columns Assemble Work Surface Support Frame Attach Work Surface to Support Frame Replace Cross Rail Cover and Trim Attach Hand Lever Leveling and Calibrating Desk eisys, inc. 112 28th Street South • Birmingham, Alabama 35233 • 205.941.1942 • www.eisys-inc.com...
  • Page 3: Exploded Desk Diagram

    DESKING eisys Work Surface Support Frame Spanners Gas Cylinder Support Frame Cross Rail Cover Gas Cylinder Cross Rail Foot pic.1 eisys, inc. 112 28th Street South • Birmingham, Alabama 35233 • 205.941.1942 • www.eisys-inc.com...
  • Page 4: Hardware & Tools

    Socket Cap Bolts —4 ea. Hand Crank (H2 only) M5 x 25 #4 x 16 Flat Head Screws —8 ea. Wood Screws —3 ea. 4” Zip Ties—3ea. eisys, inc. 112 28th Street South • Birmingham, Alabama 35233 • 205.941.1942 • www.eisys-inc.com...
  • Page 5: Section 1: Basic Assembly Of Desk

    DESKING eisys Section 1: Basic Assembly of Desk Shipped “KD” (knock down) -Pneumatic Version- [H1-no calibration H2-weight compensation] eisys, inc. 112 28th Street South • Birmingham, Alabama 35233 • 205.941.1942 • www.eisys-inc.com...
  • Page 6: Unpack And Identify Parts

    (collapsed). (pic.4a) WARNING!!! If torsion spring is pic.4a in a tight position (expanded) (H2 only) STOP! Go to Section 5 and contact eisys immediately! eisys, inc. 112 28th Street South • Birmingham, Alabama 35233 • 205.941.1942 • www.eisys-inc.com...
  • Page 7 CRITICAL!!! Make sure the gears in both columns (legs) are aligned at the exact same position in each gear track per above *TIP and picture 7. pic.8 eisys, inc. 112 28th Street South • Birmingham, Alabama 35233 • 205.941.1942 • www.eisys-inc.com...
  • Page 8: Connecting Desktop Supports To Columns

    The force of the cylinders without the weight of the top could damage the desk mechanism. pic.11 eisys, inc. 112 28th Street South • Birmingham, Alabama 35233 • 205.941.1942 • www.eisys-inc.com...
  • Page 9: Assemble Work Surface Support Frame

    Top MUST fit flush on work surface support frame. If accurate proceed to Step 5. pic.13 Generic Drilling Diagram (your diagram may be different) eisys, inc. 112 28th Street South • Birmingham, Alabama 35233 • 205.941.1942 • www.eisys-inc.com...
  • Page 10: Attach Work Surface To Support Frame

    Use wood screws to secure the rest of the pic.15 frame to the top. (pic.17) pic.16 pic.17 eisys, inc. 112 28th Street South • Birmingham, Alabama 35233 • 205.941.1942 • www.eisys-inc.com...
  • Page 11: Replace Cross Rail Cover And Trim

    Align cover on top of cross rail Screw cover to cross rail using the 8-8mm hex nuts removed in Step 2. (pic.18 & 19) pic.18 cross rail as seen from below pic.19 eisys, inc. 112 28th Street South • Birmingham, Alabama 35233 • 205.941.1942 • www.eisys-inc.com...
  • Page 12: Attach Hand Lever

    NOTE: If Desk is integrated into a lowboard/pedestal jump to Section 2/page 15, install lowboard- pedestal before moving to Step 8. pic.21 pic.22 (H2 only) eisys, inc. 112 28th Street South • Birmingham, Alabama 35233 • 205.941.1942 • www.eisys-inc.com...
  • Page 13: Leveling And Calibrating Desk

    If desk makes any unusual sounds or does not operate smoothly throughout its FULL Range of motion, STOP IMMEDIATELY, refer to Section 5 and call eisys at once. eisys, inc. 112 28th Street South • Birmingham, Alabama 35233 • 205.941.1942 • www.eisys-inc.com...
  • Page 14: Section 2: Attaching The Desk

    DESKING eisys Section 2: Attaching the Desk to the Lowboard/Pedestal eisys, inc. 112 28th Street South • Birmingham, Alabama 35233 • 205.941.1942 • www.eisys-inc.com...
  • Page 15: Attaching Desk To Lowboard

    (pic.25 & 26) pic.25 From inside the lowboard/pedestal bolt the cross rail to the top of the lowboard- pedestal. (pic 27 & 28) pic.26 pic.27 pic.28 eisys, inc. 112 28th Street South • Birmingham, Alabama 35233 • 205.941.1942 • www.eisys-inc.com...
  • Page 16 90º angle prior to fastening. Raise Desk to highest position. Allow length of Cable Chain to enter lowboard/pedestal 2”. Remove any excess Cable Chain from interior of cabinet. pic.30 pic.31 eisys, inc. 112 28th Street South • Birmingham, Alabama 35233 • 205.941.1942 • www.eisys-inc.com...
  • Page 17: Section 3: Accessories

    DESKING eisys Section 3: Accessories eisys, inc. 112 28th Street South • Birmingham, Alabama 35233 • 205.941.1942 • www.eisys-inc.com...
  • Page 18 See instructions included in the Accessory Box Desk Top Privacy Panel See instructions included in the Accessory Box CPU Holder See instructions included in the CPU Holder Box eisys, inc. 112 28th Street South • Birmingham, Alabama 35233 • 205.941.1942 • www.eisys-inc.com...
  • Page 19: Section 4: Care & Maintenance

    DESKING eisys Section 4: Care and Maintenance FAQ & Troubleshooting eisys, inc. 112 28th Street South • Birmingham, Alabama 35233 • 205.941.1942 • www.eisys-inc.com...
  • Page 20 Only apply lubricant to “moving” parts within the cross rail. Excess lubricant on exposed surfaces of the desk should be cleaned with warm soapy water and a soft cloth. eisys, inc. 112 28th Street South • Birmingham, Alabama 35233 • 205.941.1942 • www.eisys-inc.com...
  • Page 21: Faq & Troubleshooting

    *load option H1-Z4 88-176 lbs (40-80 kg) *load = additional weight equally distributed on the desk top. Use of Weight Compensation Handle-(H2 only) See user’s manual. eisys, inc. 112 28th Street South • Birmingham, Alabama 35233 • 205.941.1942 • www.eisys-inc.com...
  • Page 22: Section 5: Contact Us

    DESKING eisys Section 5: Contact Information eisys, inc. 112 28th Street South • Birmingham, Alabama 35233 • 205.941.1942 • www.eisys-inc.com...
  • Page 23 Operations/Production Manager Paul Allen (p) 205.329.7065 (e) paul.allen@eisys-inc.com Customer Service Alicia Burrow (p) 205.329.7057 (e) alicia.burrow@eisys-inc.com Customer Service Shawn Dyck (p) 205.329.7070 (e) shawn.dyck@eisys-inc.com eisys, inc. 112 28th Street South • Birmingham, Alabama 35233 • 205.941.1942 • www.eisys-inc.com...

Table of Contents