Do you have a question about the ERS-106UVP and is the answer not in the manual?
Questions and answers
Travis William Moore
January 22, 2025
How do I assemble the UV-C 1gpm unit?
1 comments:
Mr. Anderson
February 10, 2025
To assemble the PurePro ERS-106UVP UV-C 1gpm unit, follow these steps:
1. Tubing Connections: - Connect the white tubing to the water supply connector. - Connect the blue tubing to the sink top faucet. - Connect the black tubing to the drain saddle. - Connect the red tubing to the storage tank.
2. Preparation Before Assembly: - Unplug the electricity. - Turn off the water source. - Switch off the water tank.
3. Membrane Installation: - Remove the tube and membrane housing cap by turning it anticlockwise. - Use a pincer to carefully remove the existing membrane if needed. - Install the new membrane by pushing the spigot end into the socket at the far end of the housing until completely in place.
4. Install Components: - Ensure the UV stainless steel unit is properly connected within the system. - Attach the automatic shut-off valve, flow restrictor, and stainless steel check valve as per the system's design.
5. Final Steps: - Ensure all parts are securely connected and the system is completely assembled as instructed. - Follow the provided installation instructions for the specific placement and configuration of the system.
Page 1
REVERSE OSMOSIS SYSTEM Address ERS-106UVP USER'S MANUAL Introduction of ERS-106UVP What is reverse osmosis Components & Selected filters Cartridge filters The parts of ERS-106UVP Tubing connection diagram Installation diagram Change filters Change membrane Operation regulation Ultraviolet water sterilizer Maintenance checking list Memo Thank you very much for selecting Pure-Pro Water Corp.
Page 2
Maintenance checking list Introduction of ERS-106UVP ¨ERS-106UVP Quick-change RO system Filters ® PurePro Quick-Change RO system uses the most advanced water treatment technology: "Reverse Osmosis". Reverse Osmosis (RO) is recognized as one of 1st stage 2nd stage 3rd stage 4th stage...
Water flow Q: What does the PurePro series drinking water taste like? The taste of the PurePro water depends on the amount of contaminants in the tap water originally. If 95% of dissolved minerals and chemicals are removed, the R.O. water may taste like distilled water (no minerals), bottled water (low mineral), or natural spring water (moderate mineral content).
Ultraviolet water sterilizer ¨Components stainless steel 1gpm uv system The knack of 1gpm PUREPRO UV system lies in employing the 254nm ultraviolet rays (UV-C) to caused immediate death for organisms or wipe out their ability to survive and reproduce. Install UV lamp : 1.
Operation regulation Cartridge filters A.With everything connected, turn on the water check for leaks. Cartridge Filters Filter Description Service Life B.Make sure the storage tank shut-off valve is "OFF". Open the sink Stage 1 S300ST 6 Months top faucet. With only five micron rating. It is effective in 5 Micron C.Within a few minutes (up to 15) the water will start to run from the removing dirt, rust and sand particles.
Page 6
The parts of ERS-106UVP Operation regulation Plug in electricity. Turn on water source. UV water sterilizer To RO system To the faucet Post carbon filter Input water The 3rd stage filter The 1st stage filter The 2nd stage filter Switch on water tank.
Page 7
Change membrane Tubing connection diagram CONNECTING THE COLOR TUBING: Unplug electricity. Turn off water source. Switch off water tank. A. Connect the WHITE tubing to the water supply connector. To RO system B. Connect the BLUE tubing to the sink top faucet. C.
Installation diagram Change filters Input water : Install water tank : Turn off water source. Unplug electricity. Tank ball shut- off valve Water supply connector To RO system To RO system Hand tighten To RO system plastic shut-off valve to tank. Then connect color tubing.
Need help?
Do you have a question about the ERS-106UVP and is the answer not in the manual?
Questions and answers
How do I assemble the UV-C 1gpm unit?
To assemble the PurePro ERS-106UVP UV-C 1gpm unit, follow these steps:
1. Tubing Connections:
- Connect the white tubing to the water supply connector.
- Connect the blue tubing to the sink top faucet.
- Connect the black tubing to the drain saddle.
- Connect the red tubing to the storage tank.
2. Preparation Before Assembly:
- Unplug the electricity.
- Turn off the water source.
- Switch off the water tank.
3. Membrane Installation:
- Remove the tube and membrane housing cap by turning it anticlockwise.
- Use a pincer to carefully remove the existing membrane if needed.
- Install the new membrane by pushing the spigot end into the socket at the far end of the housing until completely in place.
4. Install Components:
- Ensure the UV stainless steel unit is properly connected within the system.
- Attach the automatic shut-off valve, flow restrictor, and stainless steel check valve as per the system's design.
5. Final Steps:
- Ensure all parts are securely connected and the system is completely assembled as instructed.
- Follow the provided installation instructions for the specific placement and configuration of the system.
The system should now be ready for use.
This answer is automatically generated